Maintenance
BS 65-V
wc_tx000923gb.fm
32
5.
Maintenance
5.1
Periodic Maintenance Schedule
Daily
before
starting
After
first
5
hours
Every
week
or 25
hours
Every
month
or 100
hours
Every
3 months
or 300
hours
Every
Year
Check fuel level.
Check air filter indicator. Replace
as needed.
Check ramming system oil level in
sightglass.
Check fuel line and fittings for
cracks or leaks. Replace as
needed.
Tighten ramming shoe hardware.
Check engine cylinder screws.
Check external hardware.
Clean engine cooling fins.
Clean and check spark plug gap.
Replace spark plug.
Clean recoil starter.
Change ramming system oil.*
Clean engine muffler and exhaust
port.
Inspect crane lifting cable for
wear, damage, or abuse.
Inspect fuel filter.
* Change ramming system oil after first 50 hours of operation.
Note: If engine performance is poor, check, clean, and replace air filter elements as needed.
Summary of Contents for BS 65-V
Page 1: ...Rammer BS 65 V OPERATOR S MANUAL 0176651en 001 0808 0 1 7 6 6 5 1 E N...
Page 2: ......
Page 18: ...Safety Information BS 65 V wc_si000275gb fm 18 3 5 Label Locations wc_gr005418 C P N O M...
Page 29: ...BS 65 V Operation wc_tx000918gb fm 29 Notes...
Page 35: ...BS 65 V Maintenance wc_tx000923gb fm 35 wc_gr005326...