AD 75LGR
Operation
ghi_tx001194gb.fm
17
5. If desired, connect two individual 5-inch ducts
(c
), or one 10-inch lay-flat duct
(d)
, to the rear duct outlets
(b)
. This allows for warm air to be directed into
different areas.
6. Ensure that the front hood is secured in place.
7. Connect the power cord to a 115V, 15A grounded circuit.
Result
The machine is now ready for operation.
3.4
Operation
Requirements
Machine is prepared for operation.
Area to be dried is prepared for operation.
Is
Starting
Follow the procedure below to operate the machine.
1. Press the power button to activate the machine.
The following will occur when the machine is activated.
Stopping
2. Press the power button to de-activate (stop) the machine.
Item
Action
Hour meter
The hour meter will start and display the cumulative hours.
Blower
The blower will run.
Drain pump
The drain pump will run every four minutes for a period of 20
seconds.
Defrost cycle
The defrost cycle will activate as needed. During a defrost cycle:
The defrost light illuminates.
The compressor is turned off.
The blower runs, blowing air through the evaporator coil melt-
ing any ice. When the ice is melted, the compressor is
restarted.