Installation
PS(A)2 800 / PSW3 1500
16
wc_tx001968gb.fm
3.5
Checks to Make Before Installation
•
When a grounded plug is used:
Use the megohmmeter to measure the insulation resistance between
the cable assembly prongs and ground.
•
When connection leads are used:
With the megohmmeter, measure the insulation resistance between
each core lead and the ground lead.
Reference insulation resistance: 20M
Ω
or greater
Note:
The reference insulation resistance (20M
Ω
or greater) is the
value when the pump is new or has been repaired. For the reference
value after installation, see “Periodic Maintenance Table.”
DO NOT measure the insulation resistance with insulation resistance
tester for the following parts. It will cause damage (Model PSA 2 500).
Improper ways to measure insulation resistance
1
Between the plug prongs.
2
Between the electrodes on the level relay unit.
3
Between the electrodes on the level relay unit and the plug prongs.
CAUTION
1
2
wc_gr000258
3
Summary of Contents for 0620339
Page 1: ...Operator s Manual Pump PS2 800 PSA2 800 PSW3 1500 5000187761 02 1111 5 0 0 0 1 8 7 7 6 1 EN...
Page 37: ......
Page 38: ......
Page 39: ......
Page 40: ......
Page 41: ......
Page 42: ......
Page 43: ......
Page 44: ......
Page 45: ......
Page 46: ......
Page 47: ......
Page 48: ......
Page 51: ......