Wachs TSE 1.0 Operating Instructions Manual Download Page 4

TSE TUBE SQUARING MACHINE

1.

READ THE OPERATING MANUAL!!

Reading  the  setup  and  operating  instructions  prior  to

beginning the setup procedures can save valuable time

and  help  prevent  injury  to  operators  or  damage  to
machines.

2.

INSPECT MACHINE & ACCESSORIES!

Prior to machine setup physically inspect the machine

and  it's  accessories.  Look  for  worn  tool  slides,  loose

bolts or nuts, lubricant leakage, excessive rust, etc. A

properly maintained machine can greatly decrease the
chances for injury.

3.

ALWAYS READ PLACARDS & LABELS!

All placards, labels and stickers must be clearly legible

and in good condition. Replacement labels can be pur-
chased from the manufacturer.

4.

KEEP CLEAR OF ROTATING PARTS!

Keep  hands,  arms  and  fingers  clear  of  all  rotating  or

moving parts. Always turn machine off before attempt-

ing any adjustments requiring contact with the machine
or it's accessories.

5.

SECURE LOOSE CLOTHING & JEWELRY!

Loose fitting clothing, jewelry; long, unbound hair can

get caught in the rotating parts on machines. By keeping

these things secure or removing them you can greatly
reduce the chance for injury.

6.

KEEP WORK AREA CLEAR!

Be  sure  to  keep  the  work  area  free  of  clutter  and

nonessential materials. Only allow those personnel di-

rectly associated with the work being performed to have
access to the area if possible.

ALWAYS WEAR PROTECTIVE EQUIPMENT:

WARNING

Impact  resistant  eye  pro-

tection  must  be  w or n

while  operating  or  working

near this tool.

CAUTION

Personal hearing protection

is required at all times when

operating  or  working  near

this tool.

CAUTION

Some individuals are sus-

ceptible to disorders of the

hands  and  arms  when  ex-

posed to tasks which involve

highly  repetitive  motions

and/or  vibration.  Disorders

such as Carpal tunnel syndrome and ten-

donitis  can  be  caused  or  aggravated  by

repetitious, forceful exertions of the hands

and arms.

2.

Read the Following thoroughly

before proceeding

Since 1883, EH  Wachs  has  built  a  reputation  for  quality  and  a  commitment  to  consumer  satisfaction.  In

accordance with this, Wachs must take on the added responsibility of doing  our best to assure the safest

use of our equipment.

We have assembled a list of safety reminders to aid in creating the safest possible working environment.

We recommend that the precautionary steps listed there be closely observed.

SECTION II

    

                      TSE 1.0 SAFETY INSTRUCTIONS

Summary of Contents for TSE 1.0

Page 1: ...BSOLETE JAN 2017 Tube Squaring Machine Model TSE 1 0 i TUBE PIPE SQUARING MACHINES Mod TSE Ser No E H WACHS COMPANIES 100 Shepard St Wheeling Il 60090 Patent Pending Revised January 2017 E H Wachs 600...

Page 2: ...TION III CE DECLARATION OF CONFORMITY 6 SECTION IV MACHINE SPECIFICATIONS 7 SECTION V SET UP OPERATING PROCEDURES 8 SECTION VI MAINTENANCE 11 SECTION VII OPERATIONAL CHARTS GRAPHS 12 SECTION VIII TROU...

Page 3: ...TSE TUBE SQUARING MACHINE 1 TSE 1 0 with drive motor and cord T handle allen wrench 1 Tool bit Operating Instruction Manual Shipping Case SECTION I TSE ST ANDARD EQUIPMENT...

Page 4: ...ce the chance for injury 6 KEEP WORK AREA CLEAR Be sure to keep the work area free of clutter and nonessential materials Only allow those personnel di rectly associated with the work being performed t...

Page 5: ...ile consentire l accesso solamente al personale direttamente interessato nel lavoro svolto Findal1883 laEHWachssi guadagnataunareputazioneperquantoriguardaqualit eimpegnonellasoddisfazionedeiclienti I...

Page 6: ...eia com o m ximo cuidado o que vai a seguir USE SEMPRE EQUIPAMENTO DE PROTEC O Sempre que trabalhar com esta ferramenta ou perto dela dever usar uma protec o para a vista provadechoque obrigat rio usa...

Page 7: ...et jogsmykkerogvedatsamlelangt h roppe p hovedet 6 HOLD ARBEJDSSTEDET RYDDET Arbejdsstedet skal holdes ryddeligt og fri for materialer der ikkeh rertil Uvedkommendepersonerb rikkehaveadgang til arbejd...

Page 8: ...s Used Other Safety Standards Used Name of person authorized to sign on behalf of the E H Wachs Companies Position Signature Date EC Declaration of Conformity E H Wachs Company 100 Shepard St Wheeling...

Page 9: ...rol when material removal is critical to main tain tubing lengths The TSE 1 0 offers fast production operation plus easy handling im proved finishes and consistent cuts It s ideal for contractors fabr...

Page 10: ...TSE TUBE SQUARING MACHINE SET UP OPERATING INSTRUCTIONS SECTION V...

Page 11: ...NDLE Holds tool bit C MICROMETER GAUGE Used to determine length and depth of cut D FEED NUT Turn this knob to advance tool E HANDLE Use to gain better leverage while tensioning Collet Nut 1 SPEED RANG...

Page 12: ...hten lock nut Turn clockwise until workpiece is held firmly 4 Remove workpiece by turning lock nut counter clockwise roughly 1 3 to 1 2 turn C Tool Bit Installation 1 Place tool bit into tool slot Pos...

Page 13: ...nd Removal Setup 1 To remove stand loosen 1 2 13 x 2 1 2 FHCS To reinstall stand slide FHCS through base plate and support Thread FHCS into TSE main housing and tighten TSE maintenace consists of clea...

Page 14: ...OPERATIONAL CHARTS GRAPHS SECTION VII...

Page 15: ...10 pcs 18 701 03 300 Stainless Steel Uncoated Box of 10 pcs 18 701 04 Exotic hard Material Uncoated Individual Exotic Hard Material Inconel Hastelloy etc Custom Tool Bits Available as special Order TO...

Page 16: ...oad Poor Workpiece End Quality Dull or Chipped Tool Bit Replace Tool Bit Machine Chatters During Cut RPM Speed ofTool Head Refer to Section on MachiningTips is Set Too Fast or Feed Rate is Too Light C...

Page 17: ...TSE TUBE SQUARING MACHINE PARTS LISTS EXPLODED VIEW DRAWINGS SECTION IX...

Page 18: ...RT NUMBER QTY DESCRIPTION 1 18 006 00 1 COUPLING DRIVE 2 18 012 00 1 TOOL COLLET NOT SHOWN 3 18 013 01 1 LABEL FEED METRIC NOT SHOWN 4 18 301 00 1 TSE HOUSING ASSEMBLY 5 18 MAN 01 1 MANUAL NOT SHOWN 6...

Page 19: ...NUMBER QTY DESCRIPTION 1 18 006 00 1 COUPLING DRIVE 2 18 012 00 1 TOOL COLLET NOT SHOWN 3 18 013 01 1 LABEL FEED METRIC NOT SHOWN 4 18 301 00 1 TSE HOUSING ASSEMBLY 5 18 MAN 01 1 MANUAL NOT SHOWN 6 1...

Page 20: ...RT NUMBER QTY DESCRIPTION 1 18 006 00 1 COUPLING DRIVE 2 18 012 00 1 TOOL COLLET NOT SHOWN 3 18 013 01 1 LABEL FEED METRIC NOT SHOWN 4 18 301 00 1 TSE HOUSING ASSEMBLY 5 18 408 00 1 DRIVE CORDLESS 110...

Page 21: ...E H Wachs Part No 18 MAN 01 Rev 5 0117 TSE Housing Assembly 18 301 00 NOTES ITEM PART NUMBER QTY DESCRIPTION Rev C...

Page 22: ...Cordless Electric Drive 18 408 00 2 1 3 ITEM PART NUMBER QTY DESCRIPTION 1 18 035 00 1 BASE STAND 2 18 036 00 1 SUPPORT STAND 3 90 093 13 1 FHCS 1 2 13 X 2 1 2 2 1 ITEM PART NUMBER QTY DESCRIPTION 1...

Page 23: ...E H Wachs Part No 18 MAN 01 Rev 5 0117 Collet Assembly 18 404 XX NOTES DESCRIPTION ASSEMBLY PART NO ITEM PART NO QTY DESCRIPTION ASSEMBLY PART NO TABLE...

Page 24: ......

Page 25: ...ne or estimated All repair work done at our plant will be estimated and the customer advised of cost and time required to complete repair WARRANTY INFORMATION Enclosed with the manual is a warranty ca...

Page 26: ...600 Knightsbridge Parkway Lincolnshire IL 60069 847 537 8800 www ehwachs com...

Reviews: