TSE TUBE SQUARING MACHINE
1.
READ THE OPERATING MANUAL!!
Reading the setup and operating instructions prior to
beginning the setup procedures can save valuable time
and help prevent injury to operators or damage to
machines.
2.
INSPECT MACHINE & ACCESSORIES!
Prior to machine setup physically inspect the machine
and it's accessories. Look for worn tool slides, loose
bolts or nuts, lubricant leakage, excessive rust, etc. A
properly maintained machine can greatly decrease the
chances for injury.
3.
ALWAYS READ PLACARDS & LABELS!
All placards, labels and stickers must be clearly legible
and in good condition. Replacement labels can be pur-
chased from the manufacturer.
4.
KEEP CLEAR OF ROTATING PARTS!
Keep hands, arms and fingers clear of all rotating or
moving parts. Always turn machine off before attempt-
ing any adjustments requiring contact with the machine
or it's accessories.
5.
SECURE LOOSE CLOTHING & JEWELRY!
Loose fitting clothing, jewelry; long, unbound hair can
get caught in the rotating parts on machines. By keeping
these things secure or removing them you can greatly
reduce the chance for injury.
6.
KEEP WORK AREA CLEAR!
Be sure to keep the work area free of clutter and
nonessential materials. Only allow those personnel di-
rectly associated with the work being performed to have
access to the area if possible.
ALWAYS WEAR PROTECTIVE EQUIPMENT:
WARNING
Impact resistant eye pro-
tection must be w or n
while operating or working
near this tool.
CAUTION
Personal hearing protection
is required at all times when
operating or working near
this tool.
CAUTION
Some individuals are sus-
ceptible to disorders of the
hands and arms when ex-
posed to tasks which involve
highly repetitive motions
and/or vibration. Disorders
such as Carpal tunnel syndrome and ten-
donitis can be caused or aggravated by
repetitious, forceful exertions of the hands
and arms.
2.
Read the Following thoroughly
before proceeding
Since 1883, EH Wachs has built a reputation for quality and a commitment to consumer satisfaction. In
accordance with this, Wachs must take on the added responsibility of doing our best to assure the safest
use of our equipment.
We have assembled a list of safety reminders to aid in creating the safest possible working environment.
We recommend that the precautionary steps listed there be closely observed.
SECTION II
TSE 1.0 SAFETY INSTRUCTIONS
Summary of Contents for TSE 1.0
Page 10: ...TSE TUBE SQUARING MACHINE SET UP OPERATING INSTRUCTIONS SECTION V...
Page 14: ...OPERATIONAL CHARTS GRAPHS SECTION VII...
Page 17: ...TSE TUBE SQUARING MACHINE PARTS LISTS EXPLODED VIEW DRAWINGS SECTION IX...
Page 24: ......
Page 26: ...600 Knightsbridge Parkway Lincolnshire IL 60069 847 537 8800 www ehwachs com...