Chapter 4, Setup and Operating Procedures
E.H. Wachs
Part No. 02-MAN-01, Rev. A 15
Chapter 4
Setup and Operating Procedures
w
heel
s
eTTings
MACHINE TRA
VEL
MACHINE TRA
VEL
MACHINE TRA
VEL
MACHINE TRA
VEL
MACHINE TRA
VEL
PiP E Ø 6.00” – 13.99” (152-355mm)
PiP E Ø 20.00” – 35.99” (508-914mm)
PiP E Ø 48.00” – 72.00” (1219-1829mm)
WHEEl PoSition 1 & 6
WHEEl PoSition 2 & 5
WHEEl PoSition 3 & 4
WHEEl PoSition 2 & 6
WHEEl PoSition 3 & 5
PiP E Ø 14.00” – 19.99” (356-508mm)
PiP E Ø 36.00” – 47.99” (914-1219mm)
Summary of Contents for Trav-L-Cutter HE
Page 12: ...Trav L Cutter 8 Part No 02 MAN 01 Rev A E H Wachs...
Page 28: ...Trav L Cutter 24 Part No 02 MAN 01 Rev A E H Wachs...
Page 34: ...Trav L Cutter 30 Part No 02 MAN 01 Rev A E H Wachs...
Page 43: ...Chapter 8 Parts Lists Exploded View Drawings 39 ITEM PART NUMBER QTY DESCRIPTION...
Page 47: ...Chapter 8 Parts Lists Exploded View Drawings 43 ITEM PART NUMBER QTY DESCRIPTION...
Page 67: ......