background image

WAC Lighting retains the right to modify the design of our products at any time as part of the company's continuous improvement program.

   

SEPT 2019

                  2

waclighting.com

Phone (800) 526.2588
Fax       (800) 526.2585

Headquarters/Eastern Distribution Center

44 Harbor Park Drive  
Port Washington, NY 11050

Central Distribution Center

1600 Distribution Ct
Lithia Springs, GA 30122

Western Distribution Center  

1750 Archibald Avenue  
Ontario, CA 91760

INSTALLATION INSTRUCTION

S

 

GATE

 12V

6651

INSTALLATION

1. 

2.

Excavate a trench for the Mounting Stake. 

The Mounting Stake requires approximately a one (1) square 

foot hole to facilitate installation. 

The excavated 

trench 

should be approximately 14” deep, 

depending on your local code. This will allow the hex-head 

set screw on the Mounting Stake to remain above ground 

when the installation is completed. 

3.

Secure Fixture Mounting Plate onto the Stake Metal Cap by 

using the Stake Mounting Screws. 

4.

Secure the Stake Metal Cap assembly onto the 

Mounting Stake by tighten the Cap Mounting Screw 

(

NOTE: 

Make sure the Fixture Mounting Plate is 

o

riented at desired position.) 

5.

Secure the Bollard Fixture on top of the Fixture 

Mounting Plate using the Fixture Mounting Screws. 

6.

After proper wirings are done by using the outdoor rated 

wire stable. 

7.

Turn the main power supply back on and make sure the 

Fixture Mounting Plate

Stake Metal Cap

Bollard Fixture

Fixture 

Mounting Screw

Stake Mounting Screw

Cap Mounting Screw

Mounting Stake

Reviews: