Commissioning
• Perform Insulation and Earth Continuity Tests.
• Switch on the heater(s) and confirm that the ceramic elements are operating.
• Ensure each heater aims its warmth into the target area by adjusting the heater
angle(s) as necessary, then tighten the bracket bolts when satisfactory coverage is
achieved.
• The user/customer should be made aware of all aspects of operation and safety
and is strongly advised to retain these instructions for future reference.
• In unoccupied premises it is recommended the heating system is switched off and
isolated from the electrical supply.
Maintenance
Ceramic heaters contain no moving parts and therefore require little maintenance.
Depending on the environmental conditions heaters should be regularly inspected,
(
at least every six months)
, for a build up of dust and dirt on the ceramic emitters and
reflectors which can cause overheating and premature emitter failure.
Before any maintenance work Is carried out
• Allow the heater case and element to cool to avoid injury.
• Isolate the heater(s) from the electrical power supply.
Spares
Spare ceramic elements and reflectors are available from your supplier.
Model
Wall mounting height (m)
Safety distance from
heater (m)
Minimum
Recommended
Maximum
Minimum
HC1500
2.2
2.5
3.5
1.5
HC3000
2.8
3.5
4.5
1.5
HC4500
3.0
4.0
5.5
2.0
Recommended mounting heights