Installation
Draft
4
2
Installation
Perform the following steps to successfully install and set up LQ/LQ+ series.
1. Unpack the unit.
2. Prepare to connect.
3. Connect the secure USB shell devices.
4. Install the pedestal.
5. Fix the external antenna (Optional).
6. Install the VESA Dock (Optional).
7. Connect the cables and power supply.
8. Connect to the server.
The installation sequence is explained in the following sections of this chapter.
Unpacking the Unit
Unpack the unit from its carton; handle safely to avoid damage to the thin client.
The carton shipped to you contains the following:
•
Itona LQ / LQ+ series thin client
•
Power adapter 19 V
•
Power cord country specific (Optional)
•
Mouse (Optional)
•
HDMI to DVI converter cable
•
Pedestal
•
Hardware Installation Guide
Note:
Please retain the original carton and packing material for future use.
Preparing to Connect
Before you connect and start using the thin client, ensure that the following are available.
•
Appropriate country specific power cord.
•
A well ventilated, clean, dry and dust-free place to install this thin client.
•
A minimum space of 2 inches (5 cm) on the sides of the unit for efficient convection
cooling.
•
Specified environmental conditions. For more information, see section
‘Operating Environment’.