![Vuly Sky Zone Assembly, Installation, Care, Maintenance, And Use Instructions Download Page 12](http://html1.mh-extra.com/html/vuly/sky-zone/sky-zone_assembly-installation-care-maintenance-and-use-instructions_1057180012.webp)
12
Go around your trampoline, attaching one Spring per frame section to
the Jump Mat and pulling it into the corresponding Spring hole on the
frame – until every spring is attached to the frame.
Remember:
Spring holes alternate between atop and beneath the
Curved Pole.
Mat and Springs
A. Unravel and lay your Jump Mat inside the frame, ensuring that it is
flat, with the print facing upwards.
B. Stand
between any two W-Poles
. Rotate the Jump Mat, so that the
Batch Tag lines up with a T-Joiner.
Remember:
Check that the Vuly logo is
horizontal
when looking
from
between two W-Poles
and that
only orange D-shackles are
connected
.
5
STEP
A. Attach a Spring into the orange D-shackle beside the Batch Tag, and
connect it to the Spring hole that is to the right of the chosen T-Joiner.
Note:
You must hook the short ends of the Spring hooks into the
D-shackles on the Jump Mat, and hook the long ends into the Frame.
B. Go to the opposite T-Joiner on the frame, and find the corresponding
orange D-shackle. Attach a Spring to this D-shackle and connect it
to the second Spring hole that is to the right of this T-Joiner.
Tip:
Hooking the Spring to the Jump Mat and pulling back to the
Frame is the easiest connection method. Alternatively, use the
Spring Tool to pull and connect the Springs from the Jump Mat to
the frame.
C. Repeat for each Spring, orange D-shackle and second Spring hole
that is to the right of every T-Joiner.
4
STEP
6
STEP
Ensure that the logo on the Jump Mat faces you – between two W-Poles.
A
A
B
B
Summary of Contents for Sky Zone
Page 2: ...2...
Page 19: ...19...
Page 20: ...See vulyplay com terms for the most recent Vuly warranty policies terms and conditions...