background image

– 3 –

INSTALLATION, OPERATION AND CARE OF

MODEL VCB SERIES CHARBROILERS

PLEASE KEEP THIS MANUAL FOR FUTURE USE

GENERAL

Vulcan-Hart Charbroilers are produced with quality workmanship and material. Proper installation,
usage and maintenance of your charbroiler will result in many years of satisfactory performance.

It is suggested that you thoroughly read this entire manual and carefully follow all of the instructions
provided.

INSTALLATION

Before installing, verify that the type of gas supply (natural or propane) agrees with the specifications
on the rating plate located on the right inside panel. If the supply and equipment requirements do not
agree, do not proceed with the installation. Contact your dealer or Vulcan-Hart Company immediately.

UNPACKING

This charbroiler was inspected before leaving the factory. The transportation company assumes full
responsibility for safe delivery upon acceptance of the shipment. Immediately after unpacking, check
for possible shipping damage. If the charbroiler is found to be damaged, save the packaging material
and contact the carrier within 15 days of delivery.

Carefully unpack charbroiler and place in a work-accessible area as near to its final installed position
as possible.

LOCATION

The equipment area must be kept free and clear of combustible substances.

This charbroiler is design certified for installation on a non-combustible counter with 4" (10 cm) legs,
or on a combustible floor with a 24" (61 cm) high cabinet or stand with the following minimum clearances
to adjacent wall construction:

e

c

n

a

r

a

e

l

C

m

u

m

i

n

i

M

:

m

o

r

F

e

l

b

i

t

s

u

b

m

o

C

n

o

i

t

c

u

r

t

s

n

o

C

e

l

b

i

t

s

u

b

m

o

C

-

n

o

N

n

o

i

t

c

u

r

t

s

n

o

C

k

c

a

B

l

e

v

e

L

d

i

r

G

e

v

o

b

A

l

e

v

e

L

d

i

r

G

w

o

l

e

B

)

m

c

0

3

(

"

2

1

)

m

c

8

(

"

3

)

m

c

8

(

"

3

)

m

c

8

(

"

3

s

e

d

i

S

l

e

v

e

L

d

i

r

G

e

v

o

b

A

l

e

v

e

L

d

i

r

G

w

o

l

e

B

)

m

c

3

2

(

"

9

)

m

c

8

(

"

3

"

0

"

0

Summary of Contents for VCB25S ML-44908Z

Page 1: ...4908Z VCB25M ML 44963Z VCB36 ML 44966 VCB36S ML 44909Z VCB36C ML 44967 VCB36M ML 44964Z VCB47S ML 44910Z VCB47M ML 44965Z INSTALLATION OPERATION MANUAL FORM 31167 Jan 2001 VULCAN HART COMPANY P O BOX...

Page 2: ...E EVENT A GAS ODOR IS DETECTED SHUT DOWN UNITS AT MAIN SHUTOFF VALVE AND CONTACT THE LOCAL GAS COMPANY OR GAS SUPPLIER FOR SERVICE FOR YOUR SAFETY DO NOT STORE OR USE GASOLINE OR OTHER FLAMMABLE VAPOR...

Page 3: ...mpany assumes full responsibility for safe delivery upon acceptance of the shipment Immediately after unpacking check for possible shipping damage If the charbroiler is found to be damaged save the pa...

Page 4: ...Code ANSI NFPA 70 latest edition Copies may be obtained from The National Fire Protection Association Batterymarch Park Quincy MA 02169 7471 INSTALLATION CODES AND STANDARDS In Canada 1 Local codes 2...

Page 5: ...SOLUTION DO NOT USE AN OPEN FLAME After piping has been checked for leaks all piping receiving gas should be fully purged to remove air TESTING THE GAS SUPPLY SYSTEM When gas supply pressure exceeds...

Page 6: ...ndividually adjusted to provide a blue flame Adjust all traces of yellow out of the burner flame 6 For complete shutdown turn the gas shutoff valve burner gas valves and the pilot adjustment valves to...

Page 7: ...ates may be laid in the flat position with burners full on to burn off fat and carbon When grates have cooled off brush thoroughly with a steel brush Remove grates and front grease trough for thorough...

Page 8: ...MENDED SERVICE FREQUENCY Frequency of service maintenance will be largely dependent upon customer usage 10 12 hours operation per day 7 days a week Every 30 60 days 4 6 hours a day 5 days a week Every...

Reviews: