Vulcan-Hart MGF24 Installation & Operation Manual Download Page 6

— 6 —

Connect gas supply to the fryer.  The gas supply line must be at least the equivalent of 

3

/

4

" iron pipe.

Make sure the pipes are clean and free of obstructions, dirt, and piping compound.

Hold the gas inlet pipe (in front of the manual valve) tight when making connections to prevent pressure
regulator from rotating and damaging internal tubing connections.

WARNING:  PRIOR TO LIGHTING, CHECK ALL JOINTS IN THE GAS SUPPLY LINE FOR LEAKS.
USE SOAP AND WATER SOLUTION.  DO NOT USE AN OPEN FLAME.

After piping has been checked for leaks, fully purge all piping receiving gas to remove air.

TESTING THE GAS SUPPLY SYSTEM

When test pressures exceed 

1

/

2

 psig (3.45 kPa), the fryer and its individual shutoff valve must be

disconnected from the gas supply piping system.

When test pressures are 

1

/

2

 psig (3.45 kPa) or less, the fryer must be isolated from the gas supply

system by closing its individual manual shutoff valve.

LEVELING THE FRYER

Once gas connections have been made, place a spirit level on top of the fryer.  Turn the adjustment
screw at the bottom of each leg until the fryer is level front-to-back and side-to-side.

FLUE CONNECTIONS

Adequate ventilation should be provided by a hood with vent and exhaust fan.  Never make flue
connections directly to the fryer.  A minimum clearance of 18" must be maintained from the termination
of the flue vent to the filters of the hood venting system.

Do not obstruct the flow of flue gases from the flue duct located on the rear of the fryer.  It is
recommended that the flue gases be ventilated to the outside of the building through a ventilation
system installed by qualified personnel.

Information on the construction and installation of ventilating hoods may be obtained from the
"Standard for Removal of Vapors from Commercial Cooking Equipment," NFPA #96 (latest edition),
available from the National Fire Protection Association, Batterymarch Park, Quincy, MA 02269.

ELECTRICAL CONNECTIONS

WARNING:  ELECTRICAL AND GROUNDING CONNECTIONS MUST COMPLY WITH THE
APPLICABLE PORTIONS OF THE NATIONAL ELECTRICAL CODE AND/OR OTHER LOCAL
ELECTRICAL CODES.

Summary of Contents for MGF24

Page 1: ...FORM 30951 10 95 Formerly F 990602 MGF24 MEDIUM DUTY GAS FRYER INSTALLATION OPERATION MANUAL VULCAN HART COMPANY P O BOX 696 LOUISVILLE KY 40201 0696 TEL 502 778 2791 ...

Page 2: ...PORTANT IN THE EVENT A GAS ODOR IS DETECTED SHUT DOWN UNITS AT MAIN SHUTOFF VALVE AND CONTACT THE LOCAL GAS COMPANY OR GAS SUPPLIER FOR SERVICE FOR YOUR SAFETY DO NOT STORE OR USE GASOLINE OR OTHER FLAMMABLE VAPORS OR LIQUIDS IN THE VICINITY OF THIS OR ANY OTHER APPLIANCE WARNING IMPROPER INSTALLATION ADJUSTMENT ALTERATION SERVICE OR MAINTENANCE CAN CAUSE PROPERTY DAMAGE INJURY OR DEATH READ THE I...

Page 3: ...ions 6 Electrical Connections 6 Adjustments 7 OPERATION 9 Controls 9 Before First Use 9 Lighting the Pilot 9 Adding Frying Compound 10 Turning the Fryer On 10 Turning the Fryer OFF 10 High Limit Device 10 Cleaning 10 Frying Compound Maintenance 12 Suggested Time and Temperature Chart for Deep Fat Frying 13 MAINTENANCE 14 Vent 14 Service and Parts Information 14 DEEP FRYING TROUBLESHOOTING GUIDE 15...

Page 4: ...ptance of the shipment Immediately after unpacking check for possible shipping damage If the fryer is found to be damaged save the packaging material and contact the carrier within 15 days of delivery Carefully unpack fryer and place in a work accessible area as near to its final installed position as possible Remove the packing bag containing the adjustable legs from inside the carton Before inst...

Page 5: ...accordance with 1 State and local codes 2 National Fuel Gas Code ANSI Z223 1 latest edition Copies may be obtained from The American Gas Associaton Inc 1515 Wilson Blvd Arlington VA 22209 3 National Electrical Code ANSI NFPA 70 latest edition Copies may be obtained from The National Fire Protection Association Batterymarch Park Quincy MA 02269 ASSEMBLY Screw the legs into the permanently fastened ...

Page 6: ...nnections have been made place a spirit level on top of the fryer Turn the adjustment screw at the bottom of each leg until the fryer is level front to back and side to side FLUE CONNECTIONS Adequate ventilation should be provided by a hood with vent and exhaust fan Never make flue connections directly to the fryer A minimum clearance of 18 must be maintained from the termination of the flue vent ...

Page 7: ... counterclockwise 3 Pull the top edge of the front panel to open Reverse the procedure to close the front panel Main Burner Air Supply For efficient burner operation it is important that a proper balance of gas volume and primary air supply is maintained resulting in complete combustion Insufficient air supply results in a yellow streaming flame Primary air supply is controlled by an air shutter o...

Page 8: ... 8 Fig 1 ...

Page 9: ...irmly grasp both handles of the fry tank and lift it out Rinse thoroughly and drain Be sure to remove all traces of cleaner it can affect the food taste Wipe fry tank completely dry with a soft clean cloth Clean all fryer accessories Rinse all parts thoroughly and wipe dry Seasoning Light seasoning of the backsplash area is required to avoid possible surface corrosion With a soft lint free cloth a...

Page 10: ...ostat to OFF position Seasonal Shutdown Turn thermostat to OFF position Turn gas shutoff valve OFF HIGH LIMIT DEVICE A high limit device will shut the fryer down if the oil overheats DO NOT relight pilot until oil temperature has lowered to at least 350 F If the situation persists contact your local Vulcan Hart authorized servicer CLEANING WARNING DISCONNECT ELECTRICAL POWER SUPPLY BEFORE CLEANING...

Page 11: ... black handle on the pivotal head above the fry tank and swing it to the left of the fryer until it stops 4 Remove the crumb tray 5 Firmly grasp both handles of the fry tank and lift it out 6 Strain the frying compound into a clean container 7 Replace the empty fry tank and lower the pivotal head to place thermostat bulbs inside the tank 8 Add water to the FULL mark on the tank 9 Add any good grad...

Page 12: ...move burned on foods and grease Stubborn deposits can be removed with scouring powder mixed into a paste and applied with stainless steel wool or sponges Precautions When scraping off heavy deposits of grease or oil from stainless steel equipment never use ordinary steel scrapers or knives Particles of ordinary steel may become embedded in or lodge on the surface of the stainless steel These will ...

Page 13: ...Glazed cinnamon apples 300 5 to 10 French fried sandwiches 350 1 to 2 POULTRY Chicken large pieces 325 10 to 15 Chicken small pieces 350 7 to 10 Chicken pre cooked 325 350 3 to 5 Turkey small pieces 325 9 to 10 SEAFOOD Fish cakes 350 2 to 3 Clams 350 1 to 3 Fillets small 350 3 to 5 Oysters 350 2 to 5 Scallops 350 3 to 5 Shrimp 350 4 to 6 Smelts 350 4 to 6 VEGETABLES Eggplant 350 5 to 7 Onion rings...

Page 14: ...ECT ELECTRICAL POWER SUPPLY BEFORE PERFORMING ANY MAINTENANCE VENT Annually when the fryer is cool check the flue and clear any obstructions SERVICE AND PARTS INFORMATION To obtain service and parts information concerning this fryer contact the Vulcan Hart Service Depot in your area refer to listing supplied with the fryer or Vulcan Hart Company Service Department at the address or phone number sh...

Page 15: ... 15 DEEP FRYING TROUBLESHOOTING GUIDE ...

Page 16: ... 16 FORM 30951 10 95 Formerly F 990602 PRINTED IN U S A ...

Reviews: