background image

– 8 –

TESTING THE GAS SUPPLY SYSTEM

When gas supply pressure exceeds 

1

/

2

 psig (3.45 kPa), the range and its individual shutoff valve must

be disconnected from the gas supply piping system.

When gas supply pressure exceeds 

1

/

2

 psig (3.45 kPa) or less, the range should be isolated from the

gas supply system by closing its individual manual shutoff valve until the range is ready for start-up.

FLUE CONNECTIONS

DO NOT

 obstruct the flow of flue gases from the flue located on the rear of the range. It is recommended

that the flue gases be ventilated to the outside of the building through a ventilation system installed by
qualified personnel.

From the termination of the flue to the filters of the hood venting system, a minimum clearance of 18"
(45 cm) must be maintained.

Information on the construction and installation of ventilating hoods may be obtained from the
standard, “Vapor Removal from Cooking Equipment,” NFPA No. 96 (latest edition), available from The
National Fire Protection Association, Batterymarch Park, Quincy, MA 02269.

LIGHTING AND SHUTTING DOWN PILOTS

All adjustment procedures associated with initial start-up should be performed

 by an authorized

Vulcan-Hart installation or service person.

Open Top Burners

1. Turn main gas supply ON.

2. Turn all top burner valve knobs ON to purge gas

line of air.

3. Turn top burner valve knobs OFF.

4. Wait 30 seconds.

5. Using a taper, light the open top pilot (Fig. 7).

6. If pilot fails to light, wait 5 minutes and repeat Steps

1 thru 5.

7. Turn one open top burner valve ON to ensure that

all gas lines are completely purged of air. Turn
burner OFF when gas begins to flow.

Fig. 7

Nightly Shutdown: 

Turn burner valve OFF; pilot will remain lit.

Complete Shutdown

1. Turn burner valve OFF; pilot will remain lit.

2. Turn main gas supply OFF.

Summary of Contents for MG24C

Page 1: ...Y P O BOX 696 LOUISVILLE KY 40201 0696 TEL 502 778 2791 FORM 35607 06 03 INSTALLATION OPERATION MANUAL MODEL MG24C CARRABBA S MG SERIES GAS RESTAURANT MODULAR RANGE MODEL MG24C ML 135500 MG36C ML 1355...

Page 2: ...ORTANT IN THE EVENT A GAS ODOR IS DETECTED SHUT DOWN UNITS AT MAIN SHUT OFF VALVE AND CONTACT THE LOCAL GAS COMPANY OR GAS SUPPLIER FOR SERVICE FOR YOUR SAFETY DO NOT STORE OR USE GASOLINE OR OTHER FL...

Page 3: ...stallation Codes and Standards 5 Assembly 5 Leveling 7 Gas Connections 7 Testing the Gas Supply System 8 Flue Connections 8 Lighting and Shutting Down Pilots 8 OPERATION 9 Controls 9 Preheating 9 Clea...

Page 4: ...ompany immediately LOCATION CAUTION The equipment area must be kept free and clear of combustible substances The 28 000 BTU burner input range must have a minimum clearance from combustible constructi...

Page 5: ...The Canadian Standards Association 178 Rexdale Blvd Etobicoke Ontario Canada M9W 1R3 ASSEMBLY Backsplash 1 Remove the backsplash components from the crating materials 2 Check the backsplash component...

Page 6: ...order to clear the flue box Be sure the backsplash is resting evenly and the channel holes are lining up with the holes provided in the right and left hand body side see Fig s 3 4 Fig 3 Fig 4 Fig 5 6...

Page 7: ...e range This regulator must be field installed by a qualified installer Natural gas regulators are preset for 5 0 W C Water Column propane gas regulators for 10 0 W C 1 Locate 3 4 1 9 cm gas connectio...

Page 8: ...construction and installation of ventilating hoods may be obtained from the standard Vapor Removal from Cooking Equipment NFPA No 96 latest edition available from The National Fire Protection Associa...

Page 9: ...they burn in A crust on top of the hot top range looks unsightly and slows down cooking speed because it reduces the flow of heat to the utensil Empty the grease pan daily or as often as necessary CA...

Page 10: ...flue vent every six months for obstructions SERVICE AND PARTS INFORMATION To obtain service and parts information concerning this modular range contact the Vulcan Hart Service Agency in your area refe...

Reviews: