background image

– 17 –

HIGH LIMIT DEVICE

If the water level goes below the thermostat and high limit location (Fig. 13), the high limit will turn the
pasta cooker off and extinguish the pilot.  DO NOT relight the pilot until the tank has been refilled with
water.

OVERFLOW/SKIM PORT

An overflow/skim port is provided at the front of the tank (Fig. 13) and a fill port spray nozzle is provided
at the right rear of the tank just above the fill line (Fig. 14).

The overflow/skim port serves two functions:

1. Allows operator to skim foam and starch debris from the product while cooking and also while

filling with fresh water.

2. Keeps the tank from overflowing during filling.

PL-40199-1

Thermostat

High Limit

Device

Overflow / Skim

Port

Fig. 13

Fig. 14

PL-41474-1

FILL LINE

FILL PORT SPRAY NOZZLE

Summary of Contents for GPC12

Page 1: ...ON OF ITW FOOD EQUIPMENT GROUP LLC F 31173 Rev A 02 04 INSTALLATION OPERATION MANUAL For additional information on Vulcan Hart or to locate an authorized parts and service provider in your area visit...

Page 2: ...N THE EVENT A GAS ODOR IS DETECTED SHUT DOWN UNITS AT MAIN SHUTOFF VALVE AND CONTACT THE LOCAL GAS COMPANY OR GAS SUPPLIER FOR SERVICE FOR YOUR SAFETY DO NOT STORE OR USE GASOLINE OR OTHER FLAMMABLE V...

Page 3: ...System 8 Leveling the Pasta Cooker 8 Flue Connections 9 Electrical Connections 9 Plumbing Connections 10 Water Quality 10 Drain Connections 10 OPERATION 11 Before First Use 11 Controls 12 Using the P...

Page 4: ...ling pasta quickly It is the same width as the pasta cooker Model No Tubes BTU Input Width GPC12 3 90 000 151 2 394 mm GPC12S 3 90 000 31 787 mm Standard Features include stainless steel tank sides do...

Page 5: ...he swivel head attached Look for the swivel head in the tank of the cooker and screw it onto the faucet before hooking up the water LOCATION Do not install pasta cooker next to a deep fat fryer becaus...

Page 6: ...Ontario Canada M9W 1R3 4 Canadian Electric Code CSA Standard C22 2 No 3 latest edition Copies may be obtained from The Canadian Standards Association 178 Rexdale Blvd Etobicoke Ontario Canada M9W 1R3...

Page 7: ...st transmission of strain to the connector as specified in the appliance manufacturer s instructions Attach the restraining device at the rear of the oven Fig 1 Provide a gas line strain relief to lim...

Page 8: ...checked for leaks all piping receiving gas should be fully purged to remove air GAS PRESSURES AND ORIFICES The standard orifices are set at 4 W C Water Column 1 kPa manifold pressure for natural gas a...

Page 9: ...ventilated to the outside of the building through a ventilation system installed by qualified personnel Information on the construction and installation of ventilating hoods may be obtained from the s...

Page 10: ...method may also be used It is recommended that when using the diverter method a 1 capped tee be installed for ease of cleaning This method entails 1 pipe and fittings from the discharge at the front...

Page 11: ...he Pasta Cooker 1 Use a non corrosive grease dissolving commercial cleaner to clean the protective metal oils from all surface parts and the tank interior 2 Follow the cleaner manufacturer s direction...

Page 12: ...s are supplying heat warming water in tank per thermostat HIGH LIMIT When lit there is not enough water in the tank system has shut down MANUAL FILL VALVES Model GPC12 has one hot water fill valve Mod...

Page 13: ...is is not done the tank walls can be damaged Warpage can cause leaks Turning the Pasta Cooker ON 1 Fill the pasta cooker tank to the water fill level line on the back wall which is approximately 5 127...

Page 14: ...If the pilot still fails to light contact a qualified Vulcan Hart service representative 5 Make sure the tank is full of water 6 Turn the thermostat control knob to the desired setting Turning the Pas...

Page 15: ...y vary 1 Fill tank with hot water to correct level 2 Turn thermostat to BOIL 3 Bring water to full rolling boil With Basketlift 1 Turn the timer to the desired setting 2 Set basket on basketlift arm 3...

Page 16: ...cold water to fill line you may wish to add ice Do not fill above fill line 2 Stir often to help quickly lower the temperature of the pasta Other foods such as corn on the cob may be cooked in the pas...

Page 17: ...is provided at the front of the tank Fig 13 and a fill port spray nozzle is provided at the right rear of the tank just above the fill line Fig 14 The overflow skim port serves two functions 1 Allows...

Page 18: ...r The GPC12S will have a hot and a cold valve handle Fig 15 The left handle of the GPC12S controls hot water flow to the cooker and the right handle controls cold water flow to the rinse station To st...

Page 19: ...to clean the space at the rear section of the battery between the cooker and the rinse station a Insert the brush into the opening and run brush up and down along the opening to remove any debris tha...

Page 20: ...lubricated VENT Annually when pasta cooker is cool check the flue and clear any obstructions DELIMING The pasta cooker MUST be delimed periodically depending upon usage every 3 4 weeks Follow the deli...

Reviews: