– 5 –
LOCATION
The equipment area must be kept free and clear of combustible substances.
This broiler is design certified for installation with the following minimum clearances from combustible
and noncombustible adjacent wall construction:
COMBUSTIBLE
NONCOMBUSTIBLE
MODELS
CONSTRUCTION
CONSTRUCTION
GHCB40
Back
6" (152 mm)
0"
GHCB40C
Right Side
6" (152 mm)
0"
GHCB44
Left Side
6" (152 mm)
0"
Floor
6" (152 mm)
0"
COMBUSTIBLE
NONCOMBUSTIBLE
MODEL
CONSTRUCTION
CONSTRUCTION
GHIR44
Back
4" (102 mm)
0"
Right Side
0"
0"
Left Side
0"
0"
Floor
6" (152 mm)
0"
COMBUSTIBLE
NONCOMBUSTIBLE
MODEL
CONSTRUCTION
CONSTRUCTION
HCB2
Back
4" (102 mm)
0"
Right Side
4" (102 mm)
0"
Left Side
4" (102 mm)
0"
Floor
6" (152 mm)
0"
COMBUSTIBLE
NONCOMBUSTIBLE
MODEL
CONSTRUCTION
CONSTRUCTION
IR2
Back
4" (102 mm)
0"
Right Side
0"
0"
Left Side
0"
0"
Floor
6" (152 mm)
0"
The installation location must allow adequate clearances for servicing and proper operation. A
minimum front clearance of 35" (889 mm) is required.
Do not obstruct the flow of combustion and ventilation air. Adequate clearance for air openings into
the combustion chamber must be provided. Make sure there is an adequate supply of air in the room
to replace air taken by ventilating systems and allow for combustion gas at the broiler burners.