1. INTRODUCTION 

1.1.  PRECAUTIONS, REQUIREMENTS, RECOMMENDATIONS 

Detailed analysis of this documentation, as well as assembly and use of equipment, according to the descriptions contained therein, and following all safety requirements, is the basis for the 
correct and safe operation of the device. Any other use that contradicts this instruction may cause accidents with serious consequences. Unauthorized personnel should have limited access 
to the device, while the personnel should be properly trained. The term operational personnel refers to people, who, as the result of completed training, own experience and knowledge of 
important standards, documentation and provisions, concerning safety and working conditions, have been authorized to carry out necessary work and are able to recognize potential hazards 
and avoid them. This technical documentation must be delivered together with the device. The documentation contains information concerning all possible configurations of air curtains.

 

Examples of air curtain assembly and installation, as well as activation, use, repair and maintenance. Provided that the device is operated according to the intended use, this documentation 
contains a sufficient number of instructions, required by the qualified personnel. The documentation should be placed near the device and be readily available to the service team. The 
manufacturer reserves the right to introduce 

changes

 to the instruction, as well as changes to the device that affect its operation, without prior notice. VTS shall bear no responsibility for on-

going maintenance, inspections, programming of equipment and damage, caused by standstills of equipment related to the waiting for warranty services, all and any damage related to the 

Client’s property, other than the device in question, as well as mal

functions that result from incorrect installation or improper use of the device.

 

WING air curtains are intended for indoor installation only.

 

DO NOT COVER

 

WARNING

: To avoid overheating - do not cover the device!

 

 

1.2.  TRANSPORT 

Prior to the installing and taking the device out of the cardboard box, it is required to check whether the cardboard box has not been damaged in any way and/or the adhesive tape (installed 
at the company) has not been broken off or cut. It is recommended to check whether the 

device’s

 casing has not been damaged in transport. Should any of the above situation occur, please 

contact us through telephone or e-mail: Tel. +1 470-809-6811, email

[email protected]

fax: +1 470-809-6815.

 

The device should be transported by two people. Use appropriate tools, when transporting the device, so as to avoid the damaging of goods and potential hazard to health.

 

 

1.3.  INITIAL STEPS TAKEN BEFORE THE INSTALLATION 

Record the serial number of the device on the warranty card, prior to the commencement of the installation process. It is required to properly fill-in the warranty card, once the installation is 
complete. Prior to the commencing of any installation or maintenance work, it is required to disconnect power supply and protect it against unintentional activation.

 

Installation and start-up should be performed by qualified personnel, according to the guidelines provided in this manual. The order of 

installation steps are as follows:

 

 Mount the device in its intended operation place

 

 Perform the hydraulic connection, check connections for tightness and vent the system

 

 Perform the electrical connection

 

 Make sure the device is correctly connected (according to the diagram)

 

 In the case of an electrical curtain, vacuum the heaters to avoid the unpleasant smell of burning dust

 

 Turn the power on and start the device.

 

 

2.  STRUCTURE, INTENDED USE, PRINCIPLE OF OPERATION 

2.1.  INTENDED USE 

For the convenience of users as well as different types of installations in commercial and industrial facilities we have designed an air curtain in three different options and three sizes:

 

  a WING W100 240/1/60  curtain 42in wide with a water heater (13.6-58MBH, 1089 CFM)

 

  a WING E100 (models: WING E100 240/1/60, WING E100 240/3/60, WING E100 480/3/60) curtain 42in wide with electric heaters (6.8/13.6/20.5 MBH, 1089 CFM)

 

  a WING C100 240/1/60  curtain 42in wide (1107 CFM)

 

  a WING W150 240/1/60  curtain 62in wide with a water heater (34.1- 109 MBH, 1825 CFM)

 

  a WING E150 (models: WING E10 240/3/60, WING E150 480/3/60) curtain 62in wide with electric heaters (13.6/27.3/40.9 MBH, 1854 CFM)

 

  a WING C150  240/1/60 curtain 62in wide (1884 CFM)

 

  a WING W200 240/1/60  curtain 82in wide with a water heater (58- 160 CFM, 2590 CFM)

 

  a WING E200 (models: WING E200 240/3/60, WING E200 480/3/60) curtain 82in wide with electric heaters (20.5/30.7/51 MBH, 2649 CFM)

 

  a WING C200 240/1/60 curtain 82in wide (2708 CFM)

 

The above sizes of curtains are available with three options of voltage supply: 1x240VAC, 3x240VAC, 3x480VAC

 

! Voltage supply 1x240VAC is available only for the curtains WING E100 240/1/60, all WING W and all WING C 

! Caution 

 

The following models of WING air curtains must be supplied using High-Leg Delta supplying 

circuit: 

 

WING E100 480/3/60 Air Curtain 

 

WING E150 480/3/60 Air Curtain 

 

WING E200 480/3/60 Air Curtain 

For these models, the 

L1-N

 voltage will must be 

240 VAC

.

 

 

 

The use of the WING air curtain enables the leaving of the room door open, regardless of weather conditions, thus providing a protective barrier. The curtain also enables a simultaneous keeping of 
the required heating comfort inside the room/facility. The modern design of the WING air curtain is a result of its wide range of application. The places in which it is possible to install the device include: 
malls, office buildings, supermarkets, cinema complexes, as well as shops, store-rooms, manufacturing facilities or warehouse rooms. Please notice that the use of an air curtain not only provides a 
protective barrier, but also it is an additional heat source in the room. 

APPLICATION: 

warehouse rooms, warehouses, sports facilities,

 

supermarkets, religious buildings, hotels, clinics, pharmacies, 

hospitals, office buildings, manufacturing facilities. 

PRIMARY ADVANTAGES: 

protection of climatic conditions in the room, reduction of heating/cooling costs, universal size, ability to work both in 

vertical and horizontal position; simple, quick and intuitive assembly.

 

 

2.2.  PRINCIPLE OF OPERATION 

WING W100-200 

- heating medium, for example hot heating water, returns 

heat through a heat exchanger with a wide heat-exchange surface, thus 
providing high heating output (13.6-160 MBH). A transverse fan (518-2590 
CFM) sucks in the air in the room, and pumps it through the heat exchanger, 
back  into  the  room. The  jet  of  warm  air  is  directed  downstream  at  high 
velocity, thus providing an air barrier.

 

WING E100-200 

- electric heaters (6.8-51.2 MBH) heat up, as a result of the 

flowing of electric current, and return the heat to the air; the air is blown off 
through the fan, which sucks in the air in the room. A jet of warm air is directed 
downstream at high velocity, thus providing an air barrier.

 

 

 

EN

 

Summary of Contents for WING C100-200

Page 1: ...Technical documentation Check us on WG US Rev 2 8 09 2020 WING W100 200 WING E100 200 WING C100 200 EN ...

Page 2: ...ON OF DEVICE 5 3 2 1 HORIZONTAL INSTALLATION BY MEANS OF HOLDERS 6 3 2 2 VERTICAL ASSEMBLY USING INSTALATION HOLDERS 7 3 3 ASSEMBLY AND INSTALLATION GUIDELINES 7 4 ELEMENTS OF CONTTROLS 11 5 START UP OPERATION MAINTENANCE 11 5 1 START UP PUTTING INTO OPERATION 11 5 2 OPERATION AND MAINTENANCE 11 6 SERVICING 12 6 1 PROCEDURE IN CASE OF MALFUNCTION 12 6 2 COMPLAINT PROCEDURE 12 7 INDUSTRIAL SAFETY I...

Page 3: ...heck connections for tightness and vent the system Perform the electrical connection Make sure the device is correctly connected according to the diagram In the case of an electrical curtain vacuum the heaters to avoid the unpleasant smell of burning dust Turn the power on and start the device 2 STRUCTURE INTENDED USE PRINCIPLE OF OPERATION 2 1 INTENDED USE For the convenience of users as well as ...

Page 4: ...s a valve actuator for WING W100 200 WING air curtains can be additionally equipped with a wall mounted DX controller The DX controller has a three position heating switch In the case of a water curtain to guarantee the proper functioning of the water valve the heating switch must be set to position II central otherwise the valve will not open The system of WING E100 200 is equipped with a safety ...

Page 5: ...t have a positive effect on curtain operation doors or windows that are constantly open in the room thus creating a draft presence of awning roofs etc on the outer side of the door constant and open access to staircases available through the room the chimney draft effect use of revolving doors 3 1 ASSEMBLY DISASSEMBLY OF JUNCTION BOX COVER To access the terminal block remove the screws from the ju...

Page 6: ...ers 3 Tighten the screws 2 and close the handle scovers 4 W1 in W2 in WING W E C100 30 WING W E C150 20 30 WING W E C200 36 35 OPTION II Installation brackets with their arms faced downwards Installation consists in screwing brackets to the curtain 1 Tomount the brackets to the curtain with the housing upside down punch holes 5 from the outside in the shields 4 using a hammer and a screw Click the...

Page 7: ...r and aluminum structural elements in the heat exchanger and electric heaters IMPORTANT The WING EH air curtains are not intended for the installation on suspended ceilings 3 3 INSTALLATION GUIDELINES CONNECTION OF THE HEATING MEDIUM When connecting the air curtain to the heating water pipeline secure the coil headers from excessive torque using set of two keys The weight of installed pipelines sh...

Page 8: ...n Power supply cable high voltage Cross the cables through the central gland No 1 on the drawing above Cross the cable through the central mounting point and tight the strain relief Gently pull the cable from outside to make it straight between the gland and mounting point Then tighten the gland Connect the wires to the relevant high voltage terminals Heating stages control H1 H2 High voltage Cros...

Page 9: ...plying 240VAC 3 second heating stage controlled by applying 240VAC Ai 0 10VDC analog input for fan speed regulation G Reference ground for 0 10VDC speed regulation connected internally 1L1 connected internally 2L2 connected internally WING E150 240 3 60 EC WING E200 240 3 60 EC L1 Power supply phase L2 Power supply phase L3 Power supply phase Ground 1L1 N C L2 N C 2 first heating stage controlled ...

Page 10: ...ON when the motor is running at least 45 of its full capacity Starting electric heating coils when the motor is switched OFF can be dangerous and can lead to damage to the device Electric heating coils are divided into two independent sections controlled by applying 240VAC to terminals 2 and 3 on the terminals of electric curtains EN IMPORTANT It is recommended to connect wires to the terminal str...

Page 11: ...onduits the supply conduits in particular It is advised to use vent valves in the highest point of the system It is recommended to install shut off valves directly after the device should the disassembly of the device be necessary All protectiveequipment isto beinstalledbefore the pressure increases according tomaximum the permissiblepressure ratingof 232 psi Hydraulic connection should be free of...

Page 12: ... of internal breaking of the collecting pipes Relation between the leaking and a potential mechanical damage to the exchanger Leaking of vent valve elements or drain plug Parameters of the heating medium pressure and temperature should not exceed the permissible values Correctness of the draining of the exchanger type of agent it cannot be any aggressive substance Al or Cu active Circumstances in ...

Page 13: ... 1 00 0 94 1 00 0 94 0 82 0 76 0 82 0 76 0 64 0 59 0 64 0 59 0 47 0 41 Δp psi 0 812 0 710 0 609 0 522 0 623 0 536 0 449 0 377 0 464 0 377 0 304 0 246 0 319 0 246 0 188 0 130 II 1854 CFM 48dB A Pg MBH 139 129 118 108 119 108 98 88 98 88 78 68 77 67 57 46 Tp2 F 97 103 109 114 89 95 100 106 81 86 92 97 72 78 83 88 Qw CFM 1 06 1 00 0 88 0 82 0 88 0 82 0 76 0 64 0 76 0 64 0 59 0 53 0 59 0 53 0 41 0 35 ...

Page 14: ...200 COLD AIRCURTAIN Parameters WING C100 WING C150 WING C200 Fan speed III II I III II I III II I Qp CFM 1147 882 618 1883 1324 882 2707 2001 1377 noise level dB A 62 49 45 63 49 43 63 49 45 The noise level has been measured within a 10 ft distance from the device reference conditions semi open space wall mounted device Parameters WING W100 200 WING E100 200 WING C100 200 unit of measure W100 W150...

Page 15: ...15 9 ELECTRICAL DIAGRAMS 9 1 Electrical diagram of WING W100 200 EC 1 240V ...

Page 16: ...WING W100 200 WING E100 200 WING C100 200 16 9 2 Electrical diagram of WING C100 200 EC 1 240V ...

Page 17: ...17 9 3 Electrical diagram of WING E100 EC 1 240V ...

Page 18: ...WING W100 200 WING E100 200 WING C100 200 18 9 4 Electrical diagram of WING E100 EC 3 240V ...

Page 19: ...19 9 5 Electrical diagram of WING E100 EC 3 480V ...

Page 20: ...WING W100 200 WING E100 200 WING C100 200 20 9 6 Electrical diagram of WING E150 200 EC 3 240V ...

Page 21: ...21 9 7 Electrical diagram of WING E150 200 EC 3 480V ...

Page 22: ...fication The company that installed the equipment Date of notification Type of device Factory number Date of purchase Date of installation Place of installation Detailed description of defect Contact person Name and surname Telephone E mail This field must be filled if the complaint notification refers to the following equipment VOLCANO VR1 VR2 VR3 and VRMini unit and WING air curtains ...

Page 23: ...their rights under the Warranty the Customer shall file a complaint in the country where they have purchased the device If a report is filed in another country than the country of purchase VTS is under no obligation to provide service under the warranty 4 Complaints 1 File any complaints online by sending the electronic application available on www vtsgroup com or on the phone by calling the compl...

Reviews: