3
ABOUT THIS QUICK STEP MANUAL
R
ANGE OF COVERED INFORMATION
This document is a quick installation, configuration and start-up manual for the following range of VTS Products
VVSc Floor-mounted Compact Units
VVSs Ceiling-suspended Compact
Figure 1 - VVSc and VVSs range of Air Handling Units
It is aimed to guide the user through all necessary steps, systematize the sequence of taken actions to prevent from any
damage to the equipment while setting-up the AHU.
It needs to be emphasized
, that this document IS NOT a complete Operation and Maintenance Documentation of the VTS
products and does not cover all advanced details of the products and their control application. Such information is available
in all remaining technical and maintenance manuals listed in chapter
4
STEPS TO RUN YOUR
A
IR
H
ANDLING
U
NIT
In general, the preparation of the Air Handling Unit for start-up consists of the following 4 stages:
S
TAGE
1
–
UNBOXING OF THE CONTROL ELEMENTS
Details in chapters:
S
TAGE
2
–
CONNECTING OF ALL PERIPHERAL CONTROL ELEMENTS TO THE
B
ASE
U
NIT AND POWER SUPPLY
S
TAGE
3
–
CONNECTING OF THE
A
IR
H
ANDLING
U
NIT TO MAINS
Details in chapters:
Details in chapters:
control elements to the base unit