![Vroom Spot Operating Instructions Manual Download Page 3](http://html.mh-extra.com/html/vroom/spot/spot_operating-instructions-manual_1052736003.webp)
New Construction Rough-In
Insert the pipe fitting.
The rough-in frame contains a “U-
shaped” bracket. Slide the grooved end
of the pipe fitting into U-shaped bracket.
The bracket and fitting slide to allow
adjustment for variations in wall board
thickness.
NOTE:
Valves can be used with a
maximum wall thickness of ¾
″
. Thicker
walls may require modification.
Install the pipe into the fitting
.
Glue the pipe into the fitting, making
sure it seats all the way to the ridge of
the pipe fitting.
Low-Voltage Wire
Run low-voltage wire to each inlet just
as you would with a standard central
vacuum install. Secure low-voltage wire
to pipe at the base of fitting. Allow 12
″
of slack wire and tuck back into pipe.
Install the mud cover.