background image

 

 LC-CAST 600 en v5 

 

  11 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Sub-submenu 

LAST 10

 

 
 
 

Sub-submenus 

TOTAL and AFTER 

DD/ММ/YYYY

 

 

 

 

 

 

 

 

 

 

 

Submenu 

TIME 

 

 

 

 

 

 

 

 

LAST MELTING 
([TIME]   

[HOUR]   

[DATE] 

[Т1] 

 

[Т2] 

 

[N] 

 

[UH] 

 

[UL] 

 
LAST CASTING 
[TIME]   

[HOUR]   

[DATE] 

[TORQUE] 

 

 

[REV 1] 

 
Where: 

TIME

 

  the time for melting / casting; 

HOUR  and  DATE 

show  the  last  time  when  the 

machine had been worked; 

Т1 & Т2

  are  the  temperatures  of  the  generator 

before and after the last melting; 

N

 is a number which is proportional to the load 

of generator (to the used amount of metal in the 
crucible); 

TORQUE

  is  the  centrifugal  force  the  last  casting 

was made with.  

REV 1

 is the time of first turn in milliseconds;  

 

The  information  is  the  same  like  in  submenu 

LAST

  but 

here  with  turning  the 

MPK

  you  can  track  the  last  10 

cycles.  
 
These  are  two  identical  screens  with  accumulated 
machine data. In 

TOTAL

 accumulation is from the data of 

manufacture  and  in 

AFTER  DD/ММ/YYYY

 

the  data  is 

after  the  specified  date  and  can  be  reset.  This  reset  is 
made by pressing the 

MPK

 and confirmation.  

The accumulated data are:  

TG

  –  the  lowest  and  the  highest  temperatures  of  the 

generator;  

IG 

– the heaviest load of the generator;  

UG

 – the lowest and the highest voltage of the generator;  

 
The total time (in hours and minutes) is displayed on the 
left  of  the  last  line  and  the  counter  of  castings  is 
displayed on the right.    

 

TIME >  TIME FOR CASTING  

Xxs 

CLOCK 

TIME  FOR  CASTING

  -  here  you  can  adjust  the  operating 

time of centrifugation ranged from 10 to 90 seconds.  

CLOCK

 – this sets the date and time. On the top line may 

be prohibited from appearing on the screen

.

 

 

 

 

 

Summary of Contents for LC-CAST 600

Page 1: ...LC CAST 600 en v5 1 Casting Machine LC CAST 600 USER MANUAL ...

Page 2: ...T 4 INSTALLATION AND INITIAL START UP 5 PRACTICAL USE 5 1 PRESETTING 5 2 MELTING 5 3 CASTING 5 4 INFORMATION ON THE DISPLAY 5 5 MENU 6 DESCRIPTION OF ERRORS 7 IMPORTANT PRACTICAL INFORMATION 8 TECHNICAL DATA 9 MAINTENANCE 10 SCOPE OF DELIVERY WARRANTY 3 4 5 6 7 7 8 8 8 10 13 14 15 16 16 17 ...

Page 3: ...st assistant However inappropriate use may damage the equipment and be harmful to personnel Please observe the relevant safety instructions and read the Operating Instructions carefully We wish you pleasant and fruitful work with the LC CAST 600 SYMBOLS This symbol indicates that there is high dangerous tension under the bonnet which it is put on This symbol indicates that the machine complies wit...

Page 4: ...ont panel is pressed When the engine is started the rod is locked in lower position the device is not permitted to be run by an operator who is not entirely introduced to these safety instructions before switching on the plug into the network socket you should check whether the electricity grid voltage meets the prescribed working voltage In case of incompliance seek the assistance of a specialist...

Page 5: ...nerator is monitoring by built in sensor In case of malfunction of the cooling system the process is interrupted automatically The status of the machine is indicated on the display 1 Heel 2 Carrying handle 3 Front panel 4 Handle of upper lid 5 Watching window 6 LIFT button It is used for moving the inductor up and down as well as for starting the casting process 7 Display 8 Power switch 9 Multi Pu...

Page 6: ...ce the vibrations when casting Make sure that the mains voltage is 230VAC The plug which the device is equipped with is mono phase and strengthened The respective contact is supplied together with the device Fit it on installation with a conductor 4mm 2 in thickness as it is recommended to be on a separate circle with fuse 35А The contact must be earthed reliably Make sure that there is water in t...

Page 7: ...e position most close to the muffle Move the counterweight 17 by rotating it until balance of the mechanism is achieved The non balance resulting from the shift of the molten metal away of the crucible to the muffle during the process of casting is compensated by rotation of the counterweight in direction opposite to the muffle This adjustment described is essential for avoiding of the vibrations ...

Page 8: ...r is in lower position This is done by rotation of the MPK The value is displayed as a percentage of maximum or as a progressive bar The time for casting is preset but the process if necessary may be terminated by pressing STOP To ensure the safety of the machine during the casting upper lid is locked and unlocks after completing the process The casting machine LC CAST 600 has a large display and ...

Page 9: ...W In this mode the next is shown on the display 1 line XXC MELTING M SS 4 line POWER PP Where ХХC is the generator s temperature M SS is the time for melting PP is the melting power in percentage or as a progressive bar In this mode the next sign is shown on the first line 1 line XXC CASTING M SS Where ХХC is the generator s temperature M SS is the time for casting Hints are shown on the second li...

Page 10: ...n and if the upper cover is closed the next information is displayed 2 line OPEN TO WORK If the upper lid is open the sign is 2 line CLOSE TO MELT In MANUAL mode for the power the information is shown on the 4 line and can be set by turning the MPK 4 line POWER PP The value is displayed as a percentage of maximum or as a progressive bar This depends on settings in SETTINGS POWER You can enter the ...

Page 11: ... turning the MPK you can track the last 10 cycles These are two identical screens with accumulated machine data In TOTAL accumulation is from the data of manufacture and in AFTER DD ММ YYYY the data is after the specified date and can be reset This reset is made by pressing the MPK and confirmation The accumulated data are TG the lowest and the highest temperatures of the generator IG the heaviest...

Page 12: ...automatic and manual control of the power In automatic melting the machine works in maximum power with maximum speed In manual melting the power can be reduced down to 20 from the maximum power if this is necessary POWER TORQUE you can choose how to display the value as a percentage or as a progressive bar In this submenu you can choose between six languages ENG BG RU ENGLISH БЪЛГАРСКИ РУССКИЙ ROM...

Page 13: ...r causes DESCRIPTION AND REASON Current overload of the generator Missing voltage of the generator Time to melt over the set 3 minutes There is no pressure in the cooling system Exceeding the temperature of the generator Communication error between the two boards most likely a bad connection Problems with temperature sensor DS1822 Voltage of the generator is greater than the specified Voltage of t...

Page 14: ...ater in the tank as for this purpose you open the left lid by a special switch Clean the rest of metal carefully as you look out for metal particles not to fall into the brass pipes of the inductor The windings of the inductor should not come into contact Clean the isolating plates of the inductor only with a dry towel without using of water or any solvents The lifting and carrying is made with th...

Page 15: ...ent 12 Inductor s movement 13 Overall dimensions 14 Model Weight 15 Working temperature 16 Level of environment pollution 17 The device is designed for usage in normal dental premises up to 2000 m altitude above sea level 18 The maximum relative humidity of the air must be 80 for temperatures up to 31 С decreasing lineally to 50 relative humidity for temperature 40 С 230 V 10 50Hz 2500 W ІІ 7 gr 8...

Page 16: ...ve to remove the centrifugal mechanism when you put it in place watch the signs are on the same side If these signs are not seen and the crucible can t be centered remove the centrifugal mechanism from the axle and install it in the other direction Casting machine LC CAST 600 1 pc Single phase contact 1 pc Key for open the lids 1 pc Handles 4 pcs Spare fuses 0 63А slow class T 1 pc 1 25А slow clas...

Page 17: ... WARRANTY SHEET VOP Ltd warrants the consumer for proper operation of all parts and materials in this product during a period of 12 months since the day of its purchase During this period VOP Ltd or its authorized persons will repair on its own account all defects which have occur during the normal operation of the machine Defects caused by improper transportation storage and manipulation of the p...