VOLYA FERMER-3,5 Assembly Manual Download Page 4

7

6

Technical certificate

Extra package insert

Ridge shape

1

2,10

Top draw band

1

6,76

Bottom draw band

2

0,60

Bottom arc base sheet

2

0,83

Top arc base sheet

2

2,91

Outermost base sheet for a runner

2

2,04

Tingle

18

0,094

Main shape

2

2,10

Washer 32х6

12

Bolt М6х14

32

Bolt М6х20

12

Bolt М6х60

2

Nut М6

46

Washer 6

48

Double-size scotch tape

1

5 м

Таблица 4

Technical certificate

  The greenhouse should be serviced in the winter period. The greenhouse has 

durability under the action of snow loads way more than is required for greenhouses, 
but less for some snow areas in comparison with the general construction standards. 
According to SNiP 2.10.04-85 «Greenhouses and seedbeds» «weight of snow blanket 
on 1 m2 of horizontal surface of the ground in design of static greenhouses…» should 
be taken from 10 to 40 kg/m2 depending on a snow region. This is much less than 
the general construction standards for snow load, because it is assumed that on the 
current greenhouses a snowcap is not preserved until the next snowfall. According 
to  the  results  of  strength  tests  the  limits  of  durability  of  the  greenhouse  frame 
are revealed:  destroying snow load is  360 kg/m2,  permissible load (with safety 
coefficient 1.4) – 260 kg/m2. The permissible load approximately corresponds to 
the thickness of fresh snow 0.9 m and settled snow 0.45 m. Thus, in operation it is 
necessary to prevent accumulation of snowcaps above specified limits.

If the greenhouse is not heated in winter, or it is supposed to use the greenhouse 

as  an  unheated  housing,  awning,  warehouse,  etc.,  it  is  necessary  to  control  the 
snowcap (to shift the snow down with a wooden or plastic scraper, installed on a 
pole).  For these variants of operation it is possible to supply reinforced frames with 
a  reduced  interval  between  the  power  arcs  under  the  snow  load  specified  by  the 
customer.

Do not allow damage to the frame, and if it happened, then hold timely repairs.

RULES OF OPERATION 

Cleaning and washing of polycarbonate sheets.

1. Rinse sheet with warm water.
2. To remove dirt, wash it with mild soap solution or domestic detergent using a soft 
cloth or sponge.
3. To remove water, rinse the sheet with cold water and wipe it with a soft cloth.

Never  use  abrasives  or  high-alkali  detergents  for  cleaning 
polycarbonate  sheets.  Dry  wiping  damages  covering  layer  of 
the  covering  and  shortens  its  service  life.  Never  rub  surface  of 
polycarbonate sheets with a brush, metalized fabric or other abrasive 
materials.

       Do not use sulphur cartridges for disinfecting greenhouse 
                       against fungal and bacterial agents in order to prevent 
                       corrosion (darkening) of the frame.

It is not allowed to install the greenhouse without fastening on the ground because 

of the large sail area of the greenhouse and the possibility of floating away the 

unfastened greenhouse

1. The manufacturer bears responsibility for the greenhouse frame complete 

setup.

 2. The manufacturer bears responsibility for the greenhouse
  assemblability in accordance with the manual.
3. The manufacturer bears responsibility for the greenhouse durability under 

specified magnitude of atmospheric actions.

4. Claim presentation period is 12 months from the date of purchase.

 WARRANTY LIABILITIES 

Warranty conditions

Warranty liabilities do not apply to cases of:
1. Greenhouse installation with violation of requirements of the manual.
2. Violation of the rules of operation.
3. Inappropriate use of the greenhouse.
4. Floods, hurricanes and other natural disasters.

Manufacturer: VOLYA LLC, 

per. Severny, 8, Dubna, Moscow region, 141983, Russia.

The manufacturer bears responsibility for quality of products in accordance with RF CC. The 

manufacturer reserves the right for greenhouse

                     engineering design changes.

Date of manufacture:

It is not allowed to install the greenhouse without fastening on the ground because 

of the large sail area of the greenhouse and the possibility of floating away the 

unfastened greenhouse.

Summary of Contents for FERMER-3,5

Page 1: ...Технический паспорт 1 FERMER 3 5 Technical certificate Assembly manual р 2 7 р 7 29 any length multiple of 2 1 min 4 2 m width 3 5 m height 3 25 m EURO honeycomb polycarbonate greenhouse ...

Page 2: ...ERMER 3 5 elements and strips for doors 1880х120х85 13 0 8 PACKAGE FERMER 3 5 end side brace elements 2360х85х65 11 2 9 PACKAGE FERMER 3 5 fixtures component parts and seal 325х325х330 16 5 10 PACKAGE FERMER 3 5 outermost ridge 2122х126х45 5 0 Extra package base INSERT 2 1 M FRAME ELONGATION 1 PACKAGE INSERT arc elements 3000х85х60 9 5 2 PACKAGE INSERT straight elements 2470х85х60 6 0 3 PACKAGE IN...

Page 3: ...Hinge ПН 1 130 right 4 Straight lug 40х90 4 Pull РС 80 2 4 Washer 6 692 Washer 6 3 184 Screw М6х10 DIN 965 224 Self driving screw М5х22 184 Penofol 1 11 5 Door seal 1 19 End seal 1 16 10 PACKAGE FERMER Outermost ridge 2 2 1 Тable 3 DETAILED PARTS LIST INSERT marking name quantity pcs length m 1 PACKAGE INSERT 20 Ridge arc 2 0 92 4 Arc 2 3 1 2 PACKAGE INSERT 11б Girder 1 2 47 1 Foundation stay brac...

Page 4: ...ow damage to the frame and if it happened then hold timely repairs RULES OF OPERATION Cleaning and washing of polycarbonate sheets 1 Rinse sheet with warm water 2 To remove dirt wash it with mild soap solution or domestic detergent using a soft cloth or sponge 3 To remove water rinse the sheet with cold water and wipe it with a soft cloth Never use abrasives or high alkali detergents for cleaning ...

Page 5: ...is from the right when standing outside of the greenhouse in front the door Assemblyunitsareletteredandshowninfigures Thegreenhouseisassembled by means of bolts of M6 nuts washers screws etc Joints are accomplished by overlapping of details and by fastening across the holes Install bolts nuts and washers in all places indicated in the instruction The greenhouse assembly is presented in stages at e...

Page 6: ...o inserts total length is 8 4 m А ONE INSERT extends the greenhouse by 2 13 m Number of the inserts for the greenhouse is not limited General view of the greenhouse with an insert Fig 1б Д Е Ж И К GENERAL VIEW OF THE GREENHOUSE FRAME WITH EXTENDING INSERTS Г В А Б 20 20 20 26 26 2 2 4 20 20 10ц 2к 9 2кн 1 1 5 3 20 2к 2к 2 4 4 4 4 укос укос укос 5 ...

Page 7: ...14 washer 6 Б 26 4 1 5 Г bolt М6х14 washer 6 STAGE 1 Assembly of the end wall Assembly is carried out according to the fig 1 1 Fig 1 1 General view of the end wall Д bolt М6х14 washer 6 3 1 bolt М6х14 washer 6 9 11 10ц 26 П 9 П11 П12д 9 1 Е Ж Sunken screw М6х10 INSTALLATION SEQUENCE INSTALLATION SEQUENCE ...

Page 8: ...st side walls of shapes of arcs 4 until the next operation bolt angle 2кн 2к fig 4 2 Installation of longitudinal stiffness side braces End section assembly Assembly is carried out according to the fig 4 1 The assembled power arc is brought to the end wall with the installed runners is raised to the height of the end runners and joined with their upper ends It is recommended to connect the outermo...

Page 9: ...cal position on the prepared place 200 2042 2132 L 4084 2132хN 2132 2042 fig 5 1 fig 5 2 3500 200 84 100 200 200 45 42 100 N number of sections of the greenhouse excluding end sections ref p 2 table 1 2 STAGE 6 fig 6 2 2 Extension of the frame length Assembled power arc or other end wall depending on the needed length of the greenhouse is brought to the assembled end section at the distance of the...

Page 10: ...oors are assembled in the same way Joints are shown in the figures Strips and other surface mounted components are installed after the main shape parts have been assembled ЭТАП 7 13д 12дл А 14д 12дп 13д Б screw screw В 12дл DOORS ASSEMBLY 13д 12дп Д Е П12дп 12дп 14д 14д 13д Г 12дл 16к Ж 12дл З 13дн П13дн screw screw ...

Page 11: ...utting it mark the side with the covering layer on each piece of the sheet when the shipping film is removed sheet sides look the same Shipping film shall be removed from the both sides immediately before fastening covering on the frame Cut the sheets using a fret saw or a fine pitch arm saw STAGE 8 Installation of covering CUTTING LIST OF COVERING OF AN END 1320 2930 9070 1320 1945 1945 3860 990 ...

Page 12: ...s 4 and girder 20 and then install sealing profile in accordance with fig 8 4 self tapping screw 4 2к 2кн end covering angle washer 32х6 3 fig 8 2 end covering end seal 4 Fig 8 4 Fig 8 5 FASTENING OF COVERING Penofol door seal hinge placesoffastening of door seals places of fastening of penofol Seals are installed in accordance with fig 8 5 8 6 penofol Penofol door door door door door seal Fig 8 6...

Page 13: ...es on arcs 2340 2340 2 1 0 0 nut М6 Ridge shape bolt М6х20 big arc base sheet small arc base sheet washer 32х6 Do not tighten up bolt М6х20 from the base package washer 32х6 from the base package washer 6 from the base package 1 5 7 0 double size scotch bolt М6х14 outermost base sheet for a runner outermost shape nut М6 washer 6 nut М 6 from the base package ...

Page 14: ...Bore out holes in detail 1 according to holes in bottom draw band bottom draw band 100 мм top draw band top draw band bottom draw band nut М6 washer 6 bolt М6х60 washer 6 bend the ends of the tingle after tightening of the draw band Top draw band bottom draw band Base sheet for a runner main shape bolt М6х14 Top draw band tingle Arc base sheet washer 6 nut М6 straighten the ends of the tingle ...

Page 15: ...YA DUBNA MOSCOW REGION phone fax 496 217 17 17 495 745 85 59 www perchina ru e mail info perchina ru THIS MANUAL CANNOT BE REPRODUCED IN ANY FORM IN WHOLE OR IN PART WIHOUT AN EXPRESS WRITTEN PERMISSION OF VOLYA COMPANY EN ...

Reviews: