background image

11

10

Assemble arcs 

 in pairs using ridge cover

plate and strainer 

9

. Connect end elements 

5

 to arcs 

 using arm.   

 

 

Connect balks 

2

 to

assembled arcs.

2

2

Assembling stages

Pic. 5

Pic.6

4. 

Level  the  frame  using  filling  or  deepening  of  pits  to  make  longitudinal  elements 

straight, horizontal and parallel to each other and to make arcs even at side view. If arc 
planes require leveling, loosen connections of balks with arcs, complete leveling on the 
ground and tight screws again. Fill frame supports with soil after fastening bottom wire 
bandages on element 

3

  (

Pic.10

)

1.

 

Perform the installation close to location of the greenhouse.

2.

 

Install  greenhouse  in  accordance  with  photographs  of  installation  stages  and 

units represented in  

Pic. 5

12

. The figures show installation of greenhouse of 4 m 

length.  Required length is reached using attachment of appropriate number of Insert 
packages. Use M5x10 screws for connection of elements.

3. 

Dig pits on the site selected for greenhouse installation at a depth of shovel blade 

according to

 Pic. 4

 Install frame into the pits. Check equality of frame diagonals using 

a cord. Total draft of greenhouse into the ground should be so that bottom elements 

6

 

of door opening touch the ground. Check equality of the diagonals using a cord again 
and correct position of the frame angles. 

Installation sequence

When installing the greenhouse 
through 

digging 

(without 

foundation),  connect  elements 

1

  and 

3

  to  the  frame.  Fasten 

bottom  wire  bandage  in  free 
hole  of  element 

3

.  Install  end 

elements 

6, 6к, 7, 8, 21

.

Pic.10

2

2

1

arm

Pic

. 7

Connect arcs 

 to arcs

 from one side of

greenhouse.

Connect balks 

2

 to arcs 

Pic

.9

Connect  arcs 

  and 

balks 

2

  from  the  other 

side  of  reenhouse  in  the 
same way.

Assembling stages

5

5

5

2

2

2

2

2

2

2

2

2

2

2

2

arm

Manual

Manual

4н 4н

4н 4н

(inside view)

(outside view)

arm

Pic

. 8

ridge cover 

plate

Б

9

9

9

9

2

2

2

2

2

8

21

21

8

7

7

6

3

1

2

2

2

2

2

2

А

B

А

B-1, B-2

C

А

А

А

B

C

3

1

3

1

bottom wire 

bandage

bottom wire 

bandage

B-1

B-2

adhesive tape

screw 

М5х10

screw 

М4х10

Summary of Contents for DACHNAYA STRELKA-3

Page 1: ...ANIC STRENGTH Quality management system QMS of LLC Volya is certified for compliance with standard of ISO 9001 2008 Certified by Russian Registry DACHNAYA STRELKA 3 Cellular polycarbonate greenhouse EURO Technical certificate Assembling manual page 2 5 page 6 27 ...

Page 2: ...nical certificate for further reference Description DACHNAYA STRELKA 3 greenhouse is designed for creation of microclimate favorable for growing garden crops on cottage and household plots Area of covered soil depends on length of the greenhouse table 1 Height of installed frame is 2 4 m width is 3 0 m The greenhouse may have various length depending on desire of buyer Required length of greenhous...

Page 3: ...ge with installed drawbars and side braces appears under 360 kg snow cover per 1 m2 of horizontal ground surface corresponding to 1 8 m fresh snow layer or 0 9 m packed snow layer Recommended 4 mm depth of polycarbonate is enough for Russian midland In case of regions with snow cover exceeding 0 6 m Do not install greenhouse close to buildings and trees from which snow or ice can fall down Minimal...

Page 4: ...relka 3 greenhouse 1 General view of the frame is given in Picture 1 Parts should be installed in such a way that side selves of the profile are facing the surface cover The frame is assembled of numbered parts 2 Symbols arrow shows the direction of installation as per schemes in the manual 3 Parts are fastened by putting profiles together and fastening them with screws and nuts through the holes ...

Page 5: ...iew 4Н 2 3 1 Pic 1 D outside view E inside view Dachnaya Strelka 3 extended by any number of inserts Pic 2 Pic 3 858 4060 1000 1000 1000 1000 3000 Greenhouse foundation support layout plan Pic 4 А E C B F D 1071 arm 2 2 2 2 2 2 2 2 2 2 2 2 4в 4н 4н 4в 8 8 5 6к 6 7 7 6к 10 10 10 21 18 18 9 9 9 18 5 21 11 11 3 3 1 1 60 21 ridge cover General view of insert for Dachnaya Strelka 3 greenhouse Each inse...

Page 6: ...enhouse installation at a depth of shovel blade according to Pic 4 Install frame into the pits Check equality of frame diagonals using a cord Total draft of greenhouse into the ground should be so that bottom elements 6 of door opening touch the ground Check equality of the diagonals using a cord again and correct position of the frame angles Installation sequence When installing the greenhouse th...

Page 7: ... 10 and connect it to arc 4н Door 9 9 18 18 10 4в 10 2 2 Assembling stages Manual Manual Assembled door and end small window Assemble door and end small window from elements 12 13 14 15 Pic 12 4н 4в 14 14 14 12 12 12 12 12 13 15 15 15 15 19 19 20 20 14 15 B Pic 12 А 12 13 14 13 13 13 13 15 14 14 14 12 13 Small window Pic 11 G F А B C D 11 10 10 4н 19 20 А А D G F B B C ...

Page 8: ...h inscriptions on transport film On the other side of sheet film is clear After marking the sheet but before its cutting make marks on protective side of each piece of sheet after removal of transport film sheet sides have no visual differences Transport film is removed from both sides immediately before fastening coverage on the frame CUT POLYCARBONATE SHEET STRICTLY IN ACCORDANCE WITH Pic 13 а o...

Page 9: ... polycarbonate sheet and destroy its structure Pic 16 3 Mount side pieces of coverage in accordance with Pic 16 Holding a piece of coverage fasten it with screws and washers by elements 6к 7 8 21 and by angles using tap screws with washers Holes for screws are drilled by boring bit of 5 mm diameter from inside of greenhouse through holes in frame elements Mount top pieces of coverage fastening the...

Page 10: ... сoverage 20 25mm the output of surface contour door door washer 12 8 screw М5х35 screw М5х35 door сoverage small window сoverage door сoverage ridged panel 16 16 screw М5х50 screw М5х35 5 door sealer door sealer door sealer 19 19 13 13 6 small window Pic 20 end сoverage screw М5х35 screw М5х10 screw М5х10 hinge sealer hinges washer washer washer washer washer 12 door Pic 21 6 Mount end cover plat...

Page 11: ...ator for small window locking is mounted like a door rotator rotator 12 Cellular polycarbonate shall be installed strictly defined side out towards the sun which has a protective layer The protective layer is usually at the side with the inscriptions on the transport film The film on the other side of sheet is transparent After marking the sheet but prior to its cutting make a mark on the protecte...

Page 12: ...overage х2 M4x25 х2 13 1000 х1 х2 L 1 05m Two side adhesive tape Before coating it is necessary to cut the outer surface of the upper polycarbonate sheet for bending on the ridge middle of sheet Thearrowonthedetails is directed to the front side greenhouse 1054 do not fully tighten ...

Page 13: ...Manual Manual 25 24 14 х1 Adhesive tape 15 х4 х4 M4x35 х4 Cutting and fastening of coverage Cutting and fastening of coverage 1054 ...

Page 14: ...ength with the installation of the threaded end of the screws out screw М5х14 ridge profile х1 M6x60 M6 х1 х2 х1 х1 top wire bandage M6x60 M6 х1 х2 х1 х1 top wire bandage Cutting and fastening of coverage Cutting and fastening of coverage 16 х1 х2 M4x25 х2 L 1 0m 1000 ...

Page 15: ...anufacturer LLC Volia city of Dubna Moscow Region tel fax 495 598 5 999 www perchina ru e mail info perchina ru This manual cannot be reproduced in any form fully or partially without written consent of Volia LLC ...

Reviews: