Suggested Battery Bank Capacity

Note:

 this is a guide only. It is the responsibility of the installer to ensure the correct battery bank is installed.

·Simple calculation of battery discharge time

Battery capacity / discharge current = discharge time

eg

12V/220V/50Hz/300W     full load of inverter100%  Efficiency 89%

Discharge time is 1 hour. What is the optional battery capacity?

·Select the battery size according to  the following formula

    

 300W÷89%=337W       Output power/efficiency = input power              

 337W÷10.5V=32A        Input power / battery voltage (lowest operating Voltage) = Input Current 

 32A×1hour=32AH        Input current × discharge time = battery capacity

 a 40Ah battery can be discharged in 85 minutes.

Note: (Actual discharge time error may exist according to the lifespan and mantainenece of the battery.)

Ventilation and Positioning

(Note: There should be no obstruction within 15cm of the ventilating holes.)

Mounting Suggestion:

Output and Load

 

                 CAUTION

  Input Derating Curve

                          Output Derating Curve                               

The unit should be mounted on a flat surface or holding rack with suitable strenth. In order to ensure the lifespan of 
the unit, please refrain from operating in environment of high dust, high temperature or high moisture. This is a 
power supply with built-in DC fan. Please make sure that ventilation is not blocked.

install in a horizontal position using the mounting points provided. Install in a dust & moisture free area.

The inverter can power most loads that need an AC source which need to be powered continuously. This applies to 
light loads such as phone chargers and light loads. It is not reccomended to run heavy loads continuously.

(1) Since inductive loads or motor based appliances need a large start up current (6~10 times the rated current), the 
inverter may not start up successfully with these kinds of loads. Induction cookers cannont be used on these 
inverters for this reason.
(2) When using capacitive or switched loads(such as a power supply), to ensure proper operation, only turn on the 
load or increase the load after the unit has been turned on. Do not start the inverter with the load on.

A battery bank that is of larger capacity than needed should be installed. (to meet the discharge time and load 
requirements) The time that a load can run for is NOT determined by the inverter, rather than by battery capacity.