background image

  

 

 

VPN

 

98-121

 

ISS

 

 

 
 
 
 
 
 
 
 
 

Safety Interlock Cable 

for Banner EZAC-R9-QE8 

(Voltech Part Number 250-030) 

 

Installation Guide 

 
 
 
 

Voltech Instruments Inc. 

12851 Banyan Creek Drive 

Fort Myers, FL 33908, USA 

Tel : +1 239 437 0494 

 

Voltech Instruments Ltd. 

66 Innovation Drive 

Milton Park 

Abingdon, Oxfordshire OX14 4RQ, U.K. 

Tel: +44 (0) 1235 861173 

 

 
 

www.voltech.com 

[email protected] 

 
 
 
 
 

 

Voltech Instruments are committed to a policy of continuous product development.  

Hence, product specification and the information given in this manual are subject to change 

without notice. 

 

No part of this publication may be reproduced, stored in a retrieval system, or transmitted in any 

form, or by any means electronic, mechanical photocopying, recording or otherwise without prior 

written permission of Voltech Instruments. 

 

 2016 Voltech Instruments. All rights reserved. 

 
 

 

 

Summary of Contents for 250-030

Page 1: ...861173 www voltech com sales voltech com Voltech Instruments are committed to a policy of continuous product development Hence product specification and the information given in this manual are subje...

Page 2: ...r sent manuel d utilisation Dans le doute s adresser au fournisseur GEFAHR VON ELEKTRISCHEM SCHOCK Nur entsprechend ausgebildetes Personal ist berechtigt diese Ausr stung nach dem Lesen und Verst ndni...

Page 3: ...8 3 INSTALLING THE IR SAFETY SYSTEM 2 1 9 3 1 Positioning the Light Curtain 3 1 9 3 2 Important Operator Safety 3 2 11 3 3 Important Note The Safety Enclosure 3 3 11 3 4 Connecting the Safety Interlo...

Page 4: ...n System It is designed so that it will not compromise the speed of test and your throughput in production It is based on a light curtain of infrared beams positioned in front of the tester Once the o...

Page 5: ...curtain 1 off EZAC R9 QE8 AC Interface Box Input Voltage 100 250V ac Input Frequency 50 60Hz Input Current typical 0 37A 100V ac in typical 0 23A 200V AC input 1 off SLPE14550AP8 Emitter Silver 550mm...

Page 6: ...ems may be suitable the cable has been optimized for direct and quick connection to the Banner product described in the previous chapter Length 1 75 meters Construction High quality shielded cable and...

Page 7: ...ellow and blue leads The contacts used to connect yellow to blue must be rated 230V ac 4A or more Black Link This link may be used to series two primary control relays of the safety system This provid...

Page 8: ...d 7 3 Yellow Main power breaking relays Final Switching Device of the safety system The black link is used to series 2 relays if required 7 Blue No Connection Black No Connection Black Secondary contr...

Page 9: ...ween each of the modules is via simple multi way cables which are easy for you to install Finally the AT Safety Interlock cable connects between the BANNER control box and the AT Safety Interlock sock...

Page 10: ...ht curtain 130mm minimum e Highest beam in light curtain 630mm maximum g Beam to edge of fixture 100mm minimum The two vertical columns are equipped with suitable mounting brackets making it easy for...

Page 11: ...ty enclosure when the yellow light is illuminated The light curtain then provides supplementary safety protection against accidental entry into the safety enclosure by the operator 3 3 IMPORTANT NOTE...

Page 12: ...o so could result in personal injury Consult the user manual supplied with the light curtain for up to date information 1 Voltech Safety Interlock Cable 250 030 preparation a Cut the plastic tie wrap...

Page 13: ...Banner AC Interface Box Also identify the EDM slide switch Model Number EZAC R9 QE8 5 Fit the cable gland for the AC Power Card onto the bottom hole of the Banner AC Interface Box Connect the flying l...

Page 14: ...itch to 2 CH EDM position Refer to figure 6 Figure 6 8 Fit the cable gland for the Safety Interlock Cable onto the top hole of the Banner AC Interface Box Connect the flying leads of the Safety Interl...

Page 15: ...00 s interlock port see Figure 8 Figure 8 11 Position the AT5600 light curtain beams control box and cables as described previously 12 Apply power to the light curtain control box and follow the manuf...

Page 16: ...VPN 98 121 ISSUE 3 PAGE 16 14 Banner AC Interface Box POWER light Refer to Figure 9 Figure 9...

Page 17: ...is nothing between the two columns After a few seconds the Banner AC Interface Box should be showing a green POWER light indicating that the light curtain is ready for use If the Banner AC Interface B...

Page 18: ...play of the AT5600 Repeat the above tests with the rod and observe the Icon on the front panel of the AT5600 Light Beam NOT INTERRUPTED Light Beam IS INTERRUPTED AT5600 Interlock icon is GREEN AT5600...

Page 19: ...Y SYSTEM For a description of the use of the Light Curtain with the AT5600 please see the AT5600 user manual 98 119 chapter 6 Chapter 6 5 describes the operating and warning messages that may be obser...

Page 20: ...eating a safe situation it could produce a dangerously high back EMF Clearly this means that after the light curtain has been broken there has to be a finite amount of time to switch off and safely ra...

Reviews: