[email protected] • 813.978.3700
- 7 -
Wire Connections
9
8
Install/Replace Lamp
Install Fixture to Stake
Pass supply wires through
the open slot of the stake
and thread the fixture onto
the stake. Hand tighten until
snug. Clear away area in
ground and lay the supply
wires into wireway slot.
Ground
Stem
Supply Wires
Soil
Stake
Strip both leads from fixture wires. Using two UL listed wire
connectors (sold separately), connect the leads from fixture wires to
main supply cable leads.
Main Supply
Cable
Fixture Wires
Wire Connectors
Reverse Step 2 - Step 3 to replace the flame lamp. Then reinstall the bottom
of the hat to protect the lamp. Reverse Step 5 - Step 6 to replace the SCB
lamp. Reinstall the lens to protect the lamp.
IMPORTANT: Flame lamp and SCB lamp must be protected from moisture and
dust at all times. Always reinstall the hat and lens when removed.