
1.Kids should be kept
a
safe distance
from
generator.
2.Don't touch the engine
or
muffler while generator is
running or after shutdown
to avoid
injury
. Please pay attention to warning sticker on generator.
3. Electrical equipment (including cable and plug connecting component) should
be in good condition before starting.
4. New circuit breaker must be under same level performance, characteristic and
parameters
of
the former for replacement.
5.Due to high mechanical stress, only rubber sheath cables or parity products
are allowed to be used.
6.When using extension wire or mobile distribution cabinets, wire with 1.5 square
millimeter
cross section should not be longer than 60
meters
; for 2.5
millimeter
cross section, wire should not be longer than 100
meters
.
7.With the engine of manual starting, the danger of change rotating direction
suddenly should be prevented.
8.On standard working condition of circumstance, the generator could only load
on rated output. If the working condition of circumstance is not standard, the
generator should be run at lower output. When temperature, altitude and
humidity is higher than standard working condition of circumstance, the
generator would reduce the output.
9.Before checking and maintenance of generator, the engine must be stopped.
D
isassemble the spark plug and
and shut of ignition
to make sure the engine
does
not be started improperly. Then check and maintain the generator on the
scheduled calendar of repair.
10.Except the daily
maintenance
and cleaning, the checking and readjustment
should be conducted by authorized professional person and source the
requested components by them. (contact with local dealers).
11.The new or just overhauled machine must endure the breaking-in period at
30hours at least, the output should not exceed 75% of rated output.
ATTENTION