11.VW.2210.2646_BA_V01_EN
VAS 6558A/41
13
EN | Operation
Startup
1.
Observe the safety instructions.
2.
Connect the battery interface to the connection area for the battery interface.
3.
Connect the high-voltage measurement module to the test sockets according to the
guided fault finding.
You can now perform measurements in accordance with the guided fault finding.