Page 6
Installation Instructions
PFW 6854
Mount Installation
Determine where the mount lo-
cation will be. Use a stud finder
to locate the nearest wall stud.
Once the stud has been located, use a
pencil to mark the spot.
Using a 1/4” drill bit, drill the upper mount-
ing hole where the mark was made.
Step 1
Step 2
Step 3
For ease of installation, it is recommended that two people perform the installation. One person should hold
the mount while the other person installs the lag bolt and washer. Making sure that the mount is level, the
person not holding the mount must mark and drill the second mounting hole and secure the second lag bolt
and washer.
Place a level (supplied) on the top
rail and make sure that the mount is
level. Once the mount is level, Drill
pilot holes in the lower mount-
ing slots and install two (2) 5/16” x
3” lag bolts and washers into the
mounting holes and tighten.
Step 6
Step 5
Step 4
Insert two (2) 5/16” x 3” lag bolts
and washers into the mounting
holes and tighten (see WARNING:
below
After the holes have been pre-drilled,
line up the mounting slot openings
with the pre-drilled holes.
If the studs are 12” (304.8mm) apart, use three (3) 3” (76.2mm) lag bolts for the top rail and three (3) 3” (76.2mm)
lag bolts for the lower rail. If the studs are 16”(406.4mm), 18” (457.2mm) or 24” (609.6mm) apart, use two (2) 3” lag
bolts for the top rail and two (2) 3” lag bolts for the lower rail.
Do NOT over-tighten lag bolts when attaching the mount to the wall. Improper installation may result in personal
injury or damage to property.