VMP FP-MFTB Instruction Sheet Download Page 4

WARNING: The installer of these products must verify that 

the mount surface, ceiling or wall, will safely support the 

combined weight of all attached equipment and hard-

ware.  Video Mount Products will not be held liable for the 

improper use or installation of its products.

Enjoy Your Mount!

Step 5: Securing the mounting 

brackets

Step 5

To wire the flat panel, pull the bottom of the flat panel up 
and lower the kick stand 

(#10

on both tilt brackets.  Attach 

any cables and wires at this time to the flat panel display.  
When finished fold the kick stand 

(#10

back up against the 

tilt brackets to lower the flat panel back to the wall plate 

       

.  

Step 6

Check the securement brackets 

(#9)

 and make sure the 

bottom lip of the wall plate 

(#1)

 is between the two metal 

flanges on the securement brackets.  If not adjust the se-
curement brackets 

(#9)

 until this is true.  Tighten the screw 

(#16)

 in the bottom of the securement bracket 

(#9)

 until 

the bracket is pressed firmly against the bottom lip of the 
wall plate 

(#1)

.  This step secures the tilt brackets to the wall 

plate 

(#1)

.

Step 7

To adjust the vertical height of the unit unscrew the socket 
screw 

(#12)

 at the top of the tilt brackets.  To adjust the roll 

of the unit for leveling purposes simply unscrew the same 
screw 

(#12)

 on the side which you wish to lower until you 

have achieved the desired height.  

Note:  The further out of 

level the two tilt brackets are the harder it will be to adjust 
the higher side.  If you find it difficult to turn the higher side, 
simply press up on the flat panel on the higher side to relieve 
the pressure to allow you to turn the screw easier.

Step 8

To adjust the tilt tension of the of the tilt brackets loosen or 
tighten the socket screws 

(#11)

 on the side of the tilt brack-

ets until you have achieved desire tension.

Please verify that all nuts and screws are securely tightened.

Step 6: Engaging the securement 

brackets

Step 7: Adjusting the height or roll of 

the flat panel

Step 8: Adjusting the tilt tension 

on the tilt brackets

10

10

1

9

1

16

9

1

1

12

12

11

9

Reviews: