Depósito legal y copyright. Todos los derechos reservados.
10
PRO LIFTS S.L.
Quick operation guide
ENGLISH
Diagram 4.6.1
B
C
D
E
A
Distance from the
load’s center to the
lifting carriage
Maximum load
TL-063
A
25 cm
(0.82’)
270 kg (595.3 lb)
B
30 cm
(0.98’)
230 kg (507 lb)
C
40 cm
(1.31’)
175 kg (385.8 lb)
D
50 cm
(1.64’)
140 kg (308.6 lb)
For large forks:
E
60 cm
(1.97’)
115 kg (253.5 lb)
4.7 - Elevation:
Turn the winch crank clockwise (
N
1
) to lift
the carriage and profiles. The ALS sys
-
tems enable the lift to rise and automati-
cally block the carriage and profiles whilst
rising ensuring that it will never fall. This
enables the cable to be without any force
and means it is only used for the elevation
and descent of the lift. The SRS (Sequen-
ce-Retainer-System) will also ensure that
the profiles rise in sequence, one after the
other.
4.8 - Hold:
The tower can be left in any intermediate
position if it is necessary. Just stop turning
the handle of the winch and gently turn it
in an anticlockwise direction (
N
2
) to block
the last profile risen. The ALS lock will
take the pressure of the load and release
strain applied on the cable.
4.9 - Lowering:
To bring the lift down you need to first
turn the winch handle slightly clockwise
(
N
1
) and at the same time pull the red
ALS lock (
ALS-1
) out. This releases the
blocking systems. Then turn the handle
anti-clockwise (
N
2
), whilst maintaining the
ALS lock pulled out until the profile has
been completely lowered. All red ALS
locks (
ALS-2, ALS-3 & ALS-C
) should be
pulled out one by one whilst the handle is
turned anti-clockwise (
N
2
) and the profiles
are brought down, one by one.
Security system ALS / ILS
The TL-063 incorporates the ALS securi-
ty system (Automatic Lock Security). This
VMB red trigger system automatically
blocks the tower in the position it is left
in. Each section of the lift has an ALS that
blocks the section in the unlikely event of
the cable breaking.