Viztek Vizion DR+ Maintenance And Inspection Download Page 3

QA Maintenance and Inspection ViZion DR+ Detector Guide  v2.0 

 

Opal

 

3

 

 
 

 
 

 

 

 

 

Customer Support 

1.800.366.5343 – 

[email protected]

 

VZDR-UG-QA Maintenance and Inspection ViZion DR+ Detector Guide-D-20141012-2.0 

VI. 

Inspection 

 
In order to ensure that the instrument is used safely and normally, be sure to inspect the instrument 
before use. If any problem is found during the inspection, take measures indicated. If the problem still 
cannot be corrected, contact a ViZion DR+ Dealer representative or distributor.  
 
It is recommended that a record of the inspection be kept by making copies of the check lists in this 
section, or making a separate check list.  
 
For safety reasons, be sure to turn OFF the power of the detector when the following inspections are 
about to be performed. Otherwise, it may result in electric shock 

 

VII. 

Daily Inspection 

 

Before Turning ON the Power  

 

 

 

 

After Turning ON the Power 

 

 

  Perform the following inspection with the detector power supply.  

 

  Check Power LED after power on 

 

 

 

Inspection 

Result 

Date   

Date  

Date 
  / 

General 

Check the 
Power LED  

 

 

 

 

 

 

 

  Check Link LED when panel is connected to PC and PC is power on 

 

 

Inspection 

Result 

Date   

Date  

Date 
  / 

General 

Check the Link 
LED  

 

 

 

 

 

 

 

Reviews: