1. Locate the mounting points on the bottom of the projector.
2. Attach the appropriate number of Mounting Legs (c) to the projector
using the appropriate mounting Bolts (e (i), f (i), g, h).
3. Do not tighten these bolts completely at this time.
4. The M3/M4 Washers (i) have to be used if you use the M3/M4 bolts.
1. Align the Projector Plate (a) to the mounting legs.
2. Position the legs accordingly for best configuration. You may raise or
lower each leg independently.
3. Secure the legs to the projector plate by screwing M6x16 Hexangular
Head Bolt (j) (do not over-tighten) on the mounting legs, using the
Allen Wrench (k) provided.
4. Tighten all bolts at this time.
Use the Ceiling Plate (b) as a template to mark 3 hole locations
on the ceiling. Pre-drill these holes with a 8mm masonry bit
to at least 50mm in depth. Insert a Rawlplugs (m) into each
of these holes. Make sure the rawlplugs is seated completely
flush with the concrete surface. Attach the ceiling plate to the
ceiling using 3 Philips Screws (l) and 3 Rawlplugs (m).
Use the Ceiling Plate (b) as a template to mark 3 hole locations
on the ceiling. Pre-drill these holes with a 4mm drill bit to at
least 50mm in depth. Attach the ceiling plate to the ceiling
using the 3 Philips Screws (l).
Install the Mounting Legs on the Projector
Step 1
Install the Projector Plate to the Mounting Legs
Step 2
Install the Ceiling Plate to the Ceiling
Step 3
Concrete Ceiling
Wood Stud Ceiling
ENGLISH
4mm
e (i), f (i), g, h
d
j
a
m
b
l
b
l
7