3
Install screws (M-A) or (M-B) with washers (M-C) in top two holes of
the monitor, leaving 3mm of space between the screw heads and
the monitor.
Hang monitor over top two slots of VESA plate, install two bottom
screws, and then tighten top screws,
Step 3 (Continued)
Step 4
Tighten the socket screw if the joints are making a popping sound.
Adjust arm tension by turning screw with Allen wrench (C). Turn
clockwise to reduce tension and turn counterclockwise to increase
tension. The tension should be just enough to hold your monitor In
place without lifting itself up. If needed, adjust bolts on the sides of
the hinge behind the VESA plate to tighten or loosen the tilt angle.
Step 5
Remove cable cover by
removing the screw
underneath each one.