3
ASSEMBLY STEPS
STEP 1
OPTION A: Wood Ceiling
Using ceiling template
(C)
, mark exact location of
mounting holes. Drill pilot holes 2.2” (55mm) deep
using a 3/16” (4.5mm) drill bit. Insert two screws
(W-A)
, leaving a 0.2” (5mm) gap from ceiling.
Hang the ceiling mount so that the screws fit into
the keyhole openings. Slide mount backward
then secure using additional screws
(W-A)
with
washers
(W-C)
. Tighten all screws.
OPTION B: Concrete Ceiling
Using ceiling template (C), mark exact location
of mounting holes. Drill pilot holes 2.4” (60mm)
deep, using a 3/8” (10mm) drill bit. Insert six
concrete anchors (W-B), then tighten two screws
(W-A), leaving a 0.2” (5mm) gap from ceiling. Hang
the ceiling mount so that the screws fit into the
keyhole openings. Slide mount backward, then
secure using additional screws
(W-A)
with washers
(W-C)
. Tighten all screws.
NOTE:
If mounting to a wood beam ceiling, ensure the front and
back holes are used for the main support if mount is in line with
the beam. If perpendicular to the beam, use keyhole openings for
the main support. Do NOT use included concrete anchors
(W-B)
for wood or drywall.
SMALL PARTS - NOT FOR CHILDREN UNDER 3 YEARS.
ADULT SUPERVISION IS REQUIRED.