![viveroo level Installation Manual Download Page 8](http://html1.mh-extra.com/html/viveroo/level/level_installation-manual_1038652008.webp)
MountingSet Inwall zero square
Incl. MountingSet flush mount frame with reinforcing grid
Safety informaion
! Important:
Before installing this MountingSet please read the following information. Follow the instructions and recommendations
described.
General conditions:
The MountingSet Inwall zero is an extension of MountingSet Inwall. Accordingly, it is assumed that both products are built
in combination.
The following embedding materials are approved for the attachment and incorporation of MountingSet Inwall zero: mineral
plaster, polymer modified adhesive and reinforcement cement.
The MountingSystem is designed for installation in dry and closed living spaces.
The following environmental conditions are ensured:
Ambient temperature 0 °C to 35 °C
No environmental influences, such as oil, chemicals, salt and comparable
No direct sunlight
The MountingSet must be processed and installed only by authorized personnel. This includes the proper installation of
electrical connections. The responsibility for proper installation and safe installation of the mounting system is only with
the processor. Basically, the user has to make and certify all safety checks.
Delivery contents
- Installation guide, flush-plastered MountingSet Inwall zero
- Flush mount frame with reinforcing grid
Installation in hollow walls (plasterboard)
Make an angular opening in the wall: Measurements for portrait: 271mm length, 344mm height. Measurements for
landscape: 344mm length, 271mm length. The depth should be approximately 76mm. Place the power cable.
Clean the surface of the gypsum board thoroughly and fix the flush mount frame on the gypsum fibreboard - pay attention
that the flush mount box is fastened parallel to the surface and is not shifted or offset in the wall.
! Important: The gypsum fibreboard must provide a very smooth, surface adhesion for the flush mount frame, stress-
and distortion-free!
Incorporate the flush mount frame with approved embedding material (see above). To do this, prepare the surface
according to VOB, Section C, DIN 18363, DIN 18350 or BFS notices. Then apply the embedding material evenly to the
gypsum fibreboard according to the manufacturer's instructions. Embed the reinforcement fabric of the frame in the wet
coating without any creases. After that apply embedding material again evenly, so that the grid is no longer visible.
Depending on the design ideas the flush mount frame can be plastered up to the upper edge.
After the embedding material has perfectly dried out, please clean the inner surfaces of the frame and insert the wall
case / flush mount box. Please follow the installation guide for the MountingSet Inwall.
! Attention: Install the flush box so deep that it rests firmly on the inner ring of the frame.
! Attention: Screw the wall case / flush mount box so tight that it stabilizes the frame.
Installation Guide level, Inwall, Inwall zero and Furniture, Seite von
8
12