
23
5). Operate the air conditioner at the cooling cycle and stop it when the gauge indicates 0.1MPa.
6). Set the 3-way valve to the closed position immediately
Do this quickly so that the gauge ends up indicating 0.3 to 0.5Mpa.
Disconnect the charge set, and tighten the 2-way and 3-
way valve’s stem nuts.
Use a torque wrench to tighten the 3-way valves service port cap to a torque of 18N.m.
Be sure to check for gas leakage.
2. Air purging by the refrigerant
Procedure:
1). Confirm that both the 2-way and 3-way valves are set to the closed position.
2). Connect the charge set and a charging cylinder to the service port of the 3-way valve
Leave the valve on the charging cylinder closed.
3). Air purging.
Open the valves on the charging cylinder and the charge set. Purge the air by loosening the flare nut on
the 2-
way valve approximately 45’ for 3 seconds then closing it for 1 minute; repeat 3 times.
After purging the air, use a torque wrench to tighten the flare nut on the 2 -way valve.
4). Check the gas leakage
Check the flare connections for gas leakage.
5). Discharge the refrigerant.
Summary of Contents for ACP-09CH25AELI
Page 1: ...ACP 09CH25AELI ACP 12CH35AELI ACP 18CH50AELI ACP 22CH65AELI Service manual ENG RoHS ...
Page 2: ......
Page 13: ...12 5 Wiring Diagram 5 1 Indoor Unit ACP 09CH25AELI ACP 12CH35AELI ACP 18CH50AELI ...
Page 14: ...13 ACP 22CH65AELI ...
Page 15: ...14 5 2 Outdoor Unit ACP 09CH25AELI ACP 12CH35AELI ACP 18CH50AELI ...
Page 16: ...15 ACP 22CH65AELI ...
Page 64: ......
Page 65: ......
Page 66: ......
Page 67: ......
Page 68: ......