2
1
One by one, insert the four vertical spindles through the
routed holes on the five horizontal spindles as shown.
Insert the top and bottom rails onto the trellis assembly
as shown.
Repeat for second trellis assembly.
1
2
3
STEP ONE
2
3
10’ Pergola Trellis Instructions
Trellis Assembly
x2