![vissari VISBC600 Product & Installation User Manual Download Page 6](http://html.mh-extra.com/html/vissari/visbc600/visbc600_product-and-installation-user-manual_1033364006.webp)
VISSARI ONBOARD PRODUCT & INSTALLATION USER GUIDE
MODEL VISPP900S
Required equipment for installation
We recommend Vissari rangehoods are installed by a recommended installation tradesperson.
Variety of Battery Drill Tools
Variety of Hand Tools
Variety of Drill Bits and Hole Saws
Ladders / Drop Sheets
Installation
Do not install this appliance if you find it damaged.
If this Vissari rangehood is installed damaged, Vissari will not be responsible for any costs
associated with the repair, replacement, removal or re installation of the Vissari rangehood.
Vissari recommends the rangehood be installed by a qualified rangehood installer.
Do not modify the rangehood in any way, Modification of any kind will void the warranty.
Ensure the rangehood is installed in accordance with all local council laws and regulations.
Recommended & Optimum Installation height is 750mm from benchtop to underside of
the rangehood.
Minimum Installation height above an electric hob is 650mm and a gas hob is 750mm.
Unwrap the rangehood and inspect for damage, plug in, and test the power and operation
while planning the installation.
Mark the centre line of the hob below on to the pre-installed overhead cabinet above,
then mark out the cut-out dimensions to the cabinet under panel.
Cut out the under panel to size with a jigsaw.
Screw and fix the rangehoods main body into the overhead cabinet.
Cut (depending on the model) a 160mm or 210mm hole for the ducting in the top of the
overhead cabinet and the ceiling.
Draw the ducting down from ceiling and connect to the rangehood outlet with tape and cable ties.
Plug in the rangehood and test.
Clean and commission rangehood.
06
INSTALL ATION