13
Required equipment for installation
We recommend Vissari rangehoods are installed by a recommended installation tradesperson.
Variety of battery drill tools
Variety of hand tools
Variety of drill bits and hole saws
Ladders / drop sheets
Installation
Unwrap the rangehood and inspect for damage, plug in, and test the power and operation while
planning the installation.
The optimum installation height is 750mm from benchtop to underside of the rangehood.
Mark the centre line of the hob below on to the installation wall above and mark a horizontal
finished installation height line (Optimum 750mm).
Relay the rangehoods main body hanging points on to the installation wall.
Screw and fix the rangehoods main body to the wall, ensure all screws are fixed into timber
framework behind the gib wall lining.
Cut (depending on the model) a 150mm or 200mm hole for the ducting in the ceiling.
Draw the ducting down from ceiling and connect to the rangehood outlet with tape and cable ties.
Plug in the rangehood and test.
Install the two flue covers.
Clean and commission rangehood.
INSTALL ATION