
w w w . c l a s s i c
e x h i b i t s . c o m
Step 1
Page 1 of 3
866.652.2100
© 2013
WHEN DISASSEMBLING ALUMINUM EXTRUSION, TIGHTEN ALL
SETSCREWS AND LOCKS TO PREVENT LOSS DURING SHIPPING
Order #XXXXX - Room Assembly
Item
Qty. Description
1
1
96” Q914 Vertical Extrusion
2
1
96” Q914 Vertical Extrusion
3
1
96” Q914 Vertical Extrusion
4
1
96” Q914 Vertical Extrusion w/Door Stop
5
1
96” Q914 Vertical Extrusion w/Door Hinges
6a/6b
1/1
26” Q914 Horizontal Extrusion
7a/7b
1/1
64“ Q914 Horizontal Extrusion
8a/8b
1/1
37” Z45 Horizontal Extrusion
9a/9b
1/1
64” Z45 Horizontal Extrusion
10a/10b
1/1
37” Z45 Horizontal Extrusion
1
2
3
4
5
6a
6b
7a
7b
8b
8a
9a
9b
10b
Infill
Assembled
Door
10a
Top view of
vertical
Velcro
3
Steps:
1) Slide Door Threshold into bottom of verticals [4,5] as
shown in detail.
2) Connect horizontals [6a,6b] between verticals [1 & 2].
3) Connect horizontals [8a,8b] between verticals [2 & 3].
4) Connect horizontals [9a,9b] between verticals [3,4].
5) Connect horizontals [7a,7b] between verticals [2 & 5].
6) Connect horizontals [10a,10b] between verticals [4 & 5],
inserting infill as shown.
6) Hang assembled door to vertical [5] as shown in detail.
7) Attach graphics to SEG grooves as shown
on general information page.
8) Attach backer fabric to front of backwall
as shown.
Door Attachment
Pin
Slide pin into
hinge attached
to vertical.
Slide door
hinge atop pin.
Door
Hinge
Hinge
Door Threshold
Tighten
to secure
Slide into
groove
Top view of
vertical
2