background image

5

1

STEP

• Place the rubber console mast boot
on the end of the console mast.

• Connect the wire tie that exits the 
bottom of the console mast to the 
bundle of wires that comes from the
bracket at the top of the frame. Pull the
wire tie and wire harness up through the
console mast while at the same time
inserting the console mast into the frame
bracket.

• Secure the console mast to the frame
with two capscrews (M10 x 70L).
Tighten with the 8

MM

L-shaped Allen

wrench.

• Stabilize the console mast to the
frame with the socket head cap screw
(M10x70L). Tighten with the 
10

MM

L-shaped Allen wrench.

• Slide the rubber boot down the 
console mast and snap it in place so
it integrates with the side covers.

ORANGE BAG

1

STEP

2

STEP

2

STEP

• Place a wavy washer
(M20x30x1.5t) on the axle located
under the foot plate of the right lower
link arm.

• Slide the axle of the lower link arm
into the bracket located on the top of
the right pedal arm. Secure lower link
arm by attaching the pedal support
bracket and screw (M8x15L) to the
end of the axle. Secure the outside
holes in the bracket to the footplate
with two screws (M8x10L). Tighten
screws with the 5

MM

Allen wrench.

• Repeat the same steps on the left
side.

BLUE BAG

Reviews: