II JJ
HH
GG
DD
Front View
Side View
Gussett
22
12
STEP
NOTE: You will need to remove pulleys GG, HH, II,
and JJ to route cable #6.
• Thread the bolt a minimum of 0.5” into
pulley DD. Tighten nut to pulley housing.
Route the cable through the specified pulleys
in the following order: under GG, under
HH, over II, and under JJ. Connect the ter-
mination to the leg press swing arm with a
bolt (M8x19) and a nut (M8).
WARNING:
Failure to thread the specified distance
can result in serious injur y!
CABLE #6
(1/4” diameter)
Summary of Contents for Multi-Station Gym ST710
Page 1: ...A s s e m b l y Owner s Guide ST710 MULTI STATION GYM...
Page 2: ...2...
Page 26: ...26 200 100 50 50 100 90 80 EFFECTIVE RESISTANCE...
Page 33: ...33...
Page 42: ...42...
Page 43: ...43...
Page 44: ...44...
Page 45: ...45...
Page 46: ...46...
Page 47: ...47...