BORIS Operating Manual
Page 5
2.4
Installation
For any questions relating to the installation of this BORIS unit contact our service
department at telephone number (804) 225-5530.
IMPORTANT
: Transient voltages, short circuits and grounds can damage
BORIS. It is STRONGLY recommended that the elevator be installed, and all
systems be made operational
BEFORE
BORIS is connected. To run the
elevator without BORIS, plug connector labeled “LOAD” into outlet mounted in
controller. (This is “As Shipped”.) When the elevator is installed, and fully
operational, install BORIS as described below.
1.
Verify that the voltage at terminals B3-B4 is between 110 and 120 VAC.
2.
Verify that the utility voltage and frequency on BORIS agree with that listed on the
schematics and controller label. This is normally 120 VAC, 60 Hertz.
3.
Verify that no changes have been made to the plug wiring.
4.
Check the connection of the 4
th
pole of the Main Line Disconnect Switch. TB-1 & L5
should be closed when the disconnect switch is closed, and open when the disconnect
switch is open. This is very important for proper “power up” and “power down” of unit.
NOTE:
The BORIS Unit battery has been disconnected for shipment under
Department of Transportation Regulations.
5.
Close the “Battery Connector” plug on the back of unit to reconnect battery. (See
picture below) The unit on the left is shown with the connector “open.” The unit on the
right is shown with the connector “closed.”