Viqua S2Q-P/12VDC Owner'S Manual Download Page 7

Installation

7

2.

Select a suitable location for the disinfection system and its related components. As it is recommended to install a GFCI, 
make sure that this is taken into consideration prior to any installation. The system can either be installed vertically (inlet 
port at the bottom) as shown in 

Figure 4

 

A

or horizontally as shown in 

Figure 4

 

B

. However, the vertical installation is the 

most preferred method. When selecting a mounting location, leave enough space to allow the removal of the UV lamp 
and/or quartz sleeve (typically leave a space equal to the size of the UV chamber itself).

3.

Mount the system to the wall using the supplied clamps. Various connection methods can be used to connect the water 
source to the system, however union type connectors are recommended. The use of a flow restrictor device will help to 
maintain the manufacturers rated flow. The flow restrictor should be installed on the outlet port and is designed to be 
installed in one direction only. Ensure that the flow of the water matches the flow direction as indicated on the flow 
restrictor. Refer to 

Figure 5

.

Note: 

DO NOT solder connections while attached to the system as this could damage the O-ring seals.

Figure 3 Disinfection System

Figure 4 Disinfection Installation - Vertical and Horizontal

Optional flow restrictor

Note:

 Mandatory for

NSF credited systems

Note:

 UV system should  

be the final piece of 
treatment equipment

Water

meter

Main

water

shut-off

Optional water

softener

To

drain

5 Micron

sediment

filter

Optional

carbon

filter

Optional by-pass

assembly

Optional by-pass

assembly

Optional
by-pass
assembly

Optional

drain

cock

Optional
solenoid

valve

Hot water pipes
Cold water pipes

Customer supplied

GFCI circuit to

match voltage

A

B

Unit overall length

Min. clearance equal

to unit overall length

Unit overall length

Min. clearance equal

to unit overall length

Summary of Contents for S2Q-P/12VDC

Page 1: ...f 1 519 763 5069 e mail info viqua com www viqua com Models S1Q PA S2Q PA S5Q PA S8Q PA S2Q P 12VDC S5Q P 12VDC NSF Standard 55 Class B Validated Models SV5Q PA SV8Q PA Owner s Manual Powered by Syste...

Page 2: ...y should you insist on genuine factory supplied VIQUA replacement lamps Use of widely available non genuine replacement lamps has been shown to damage the control module of VIQUA UV disinfection equip...

Page 3: ...started Warning This product may contain chemicals known to the State of California to cause cancer and birth defects or other reproductive harm DANGER Failure to follow these instructions will resul...

Page 4: ...d inhalation or ingestion of the debris and avoid exposure to eyes and skin Never use a vacuum cleaner to clean up a broken lamp as this may scatter the spilled mercury Obey local regulations and guid...

Page 5: ...r long consistent life 9000 hours S287RL S1Q PA S330RL S2Q PA S463RL S5Q PA SV5Q PA S810RL S8Q PA SV8Q PA 7 Controller for 100 240V models only BA ICE S S1Q PA S2Q PA S5Q PA S8Q PA SV5Q PA SV8Q PA 8 C...

Page 6: ...it may be exposed to the weather Install the disinfection system on cold water line only before any branched lines A 5 micron sediment filter must precede the disinfection system Ideally the disinfect...

Page 7: ...tain the manufacturers rated flow The flow restrictor should be installed on the outlet port and is designed to be installed in one direction only Ensure that the flow of the water matches the flow di...

Page 8: ...a leak shut water off drain cell remove the retaining nut wipe the O ring and threads Clean and re install 7 Once it is determined that there are no leaks plug the system into the ground fault interru...

Page 9: ...ocedure for any other conditioners that may form a part of the pre treatment for the UV unit 2 The above disinfection procedure will result in a massive chlorine residual far in excess of the 0 5 to 1...

Page 10: ...org for UV lamp disposal DO NOT use water during replacement of UV lamp 1 Shut off the water line to chamber and release system pressure before servicing 2 0 30 15 45 10 mins Disconnect main power sou...

Page 11: ...ring 4 Carefully remove O ring adhering to the quartz sleeve Remove the quartz sleeve 5 Mild Acid Clean the quartz sleeve with a cloth soaked in CLR vinegar or some other mild acid and then rinse wit...

Page 12: ...refer to Section 4 1 5 1 3 Resetting UV lamp Life Refer to Section 4 1 Note Even though the alarm on the system can be deferred for a period of time it is important to address each and every alarm co...

Page 13: ...d or UV sensor Ensure O ring is in place check for cuts or abrasions clean O ring moisten with water lubricant and re install replace if necessary 410867 Condensation on UV chamber caused by excessive...

Page 14: ...1 cm x 6 4 cm 7 3 x 3 2 x 2 5 18 6 cm x 8 1 cm x 6 4 cm 7 3 x 3 2 x 2 5 Controller 12 VDC 13 5 cm x 4 3 cm x 5 8 cm 5 3 x 1 7 x 2 3 13 5 cm x 4 3 cm x 5 8 cm 5 3 x 1 7 x 2 3 Inlet Outlet Port Size1 1...

Page 15: ...Hardware Components VIQUA warrants the electrical controller and hardware components to be free from defects in material and workmanship for a period of three 3 years from the date of purchase During...

Page 16: ...425 Clair Rd W Guelph Ontario Canada N1L 1R1 t 1 519 763 1032 tf 1 800 265 7246 US and Canada only t 31 73 747 0144 Europe only f 1 519 763 5069 e mail info viqua com www viqua com...

Reviews: