Viqua S2Q-P/12VDC Owner'S Manual Download Page 9

Installation

9

3.2 Disinfection Procedure

UV disinfection is a physical disinfection process and does not add any potentially harmful chemicals to the water. As UV 
does not provide a disinfection residual, it is imperative that the entire distribution system located after the UV be chemically 
disinfected to ensure that the plumbing system is free from any bacteriological contaminants. The disinfection process must 
be performed immediately after the UV unit is installed and repeated thereafter whenever the UV is shut down for service, 
without power, or inoperative for any reason. The procedure for sanitizing the plumbing system is readily accomplished as 
follows:

Notes: 

1) The addition of chlorine (bleach) to a hot water tank that has in the past been fed with untreated raw water with 

high levels of other contaminants (iron, manganese, hydrogen sulphide, organics, etc.) will result in oxidation 
of these contaminants and may require repeated flushing of the hot water tank. This contingency must be dealt 
with independently under the start-up procedure for any other conditioners that may form a part of the pre-
treatment for the UV unit.

2) The above disinfection procedure will result in a massive chlorine residual far in excess of the 0.5 to 1.0 mg/L 

typically present in municipally chlorinated water and of a magnitude consistent with the minimum 50 mg/L 
chlorine solution recommended for the disinfection of distribution systems known to be contaminated. DO NOT 
consume water until complete system has been flushed

.

•   

Ensure the controller is 

plugged in for entire 
disinfection process.

1

2

2

2

1

2

2

2

•   

Shut off the water supply.

•   

Close each faucet.

3

•   

Remove filter cartridge(s).

•   

Pour 2 cups of household 

bleach solution into the filter 
housing(s).

Note: 

DO NOT use 

Hydrogen Peroxide.

4

      Household 5.25%
       Bleach Solution

BLEACH

x2

2

1

5

2

1

2

2

2

•   

Re-install the housings.

•   

Turn on the cold water supply.

•   

Open each faucet and all 

water openings until you 
smell the bleach and then 
close the faucets.

6

2

1

2

2

2

•   

Turn on the hot water supply.

•   

Open each faucet and all 

water openings until you 
smell the bleach and then 
close the faucets.

7

2

0

30

15

45

30 mins

•   

DO NOT use water for 30 
minutes.

•   

Flush the system until no 

chlorine smell is detectable 
and reinstall the filters.

8

•   

Reinstall filter housing(s).

Summary of Contents for S2Q-P/12VDC

Page 1: ...f 1 519 763 5069 e mail info viqua com www viqua com Models S1Q PA S2Q PA S5Q PA S8Q PA S2Q P 12VDC S5Q P 12VDC NSF Standard 55 Class B Validated Models SV5Q PA SV8Q PA Owner s Manual Powered by Syste...

Page 2: ...y should you insist on genuine factory supplied VIQUA replacement lamps Use of widely available non genuine replacement lamps has been shown to damage the control module of VIQUA UV disinfection equip...

Page 3: ...started Warning This product may contain chemicals known to the State of California to cause cancer and birth defects or other reproductive harm DANGER Failure to follow these instructions will resul...

Page 4: ...d inhalation or ingestion of the debris and avoid exposure to eyes and skin Never use a vacuum cleaner to clean up a broken lamp as this may scatter the spilled mercury Obey local regulations and guid...

Page 5: ...r long consistent life 9000 hours S287RL S1Q PA S330RL S2Q PA S463RL S5Q PA SV5Q PA S810RL S8Q PA SV8Q PA 7 Controller for 100 240V models only BA ICE S S1Q PA S2Q PA S5Q PA S8Q PA SV5Q PA SV8Q PA 8 C...

Page 6: ...it may be exposed to the weather Install the disinfection system on cold water line only before any branched lines A 5 micron sediment filter must precede the disinfection system Ideally the disinfect...

Page 7: ...tain the manufacturers rated flow The flow restrictor should be installed on the outlet port and is designed to be installed in one direction only Ensure that the flow of the water matches the flow di...

Page 8: ...a leak shut water off drain cell remove the retaining nut wipe the O ring and threads Clean and re install 7 Once it is determined that there are no leaks plug the system into the ground fault interru...

Page 9: ...ocedure for any other conditioners that may form a part of the pre treatment for the UV unit 2 The above disinfection procedure will result in a massive chlorine residual far in excess of the 0 5 to 1...

Page 10: ...org for UV lamp disposal DO NOT use water during replacement of UV lamp 1 Shut off the water line to chamber and release system pressure before servicing 2 0 30 15 45 10 mins Disconnect main power sou...

Page 11: ...ring 4 Carefully remove O ring adhering to the quartz sleeve Remove the quartz sleeve 5 Mild Acid Clean the quartz sleeve with a cloth soaked in CLR vinegar or some other mild acid and then rinse wit...

Page 12: ...refer to Section 4 1 5 1 3 Resetting UV lamp Life Refer to Section 4 1 Note Even though the alarm on the system can be deferred for a period of time it is important to address each and every alarm co...

Page 13: ...d or UV sensor Ensure O ring is in place check for cuts or abrasions clean O ring moisten with water lubricant and re install replace if necessary 410867 Condensation on UV chamber caused by excessive...

Page 14: ...1 cm x 6 4 cm 7 3 x 3 2 x 2 5 18 6 cm x 8 1 cm x 6 4 cm 7 3 x 3 2 x 2 5 Controller 12 VDC 13 5 cm x 4 3 cm x 5 8 cm 5 3 x 1 7 x 2 3 13 5 cm x 4 3 cm x 5 8 cm 5 3 x 1 7 x 2 3 Inlet Outlet Port Size1 1...

Page 15: ...Hardware Components VIQUA warrants the electrical controller and hardware components to be free from defects in material and workmanship for a period of three 3 years from the date of purchase During...

Page 16: ...425 Clair Rd W Guelph Ontario Canada N1L 1R1 t 1 519 763 1032 tf 1 800 265 7246 US and Canada only t 31 73 747 0144 Europe only f 1 519 763 5069 e mail info viqua com www viqua com...

Reviews: