background image

Viper Installation and Operators Manual 2.08

Rate +/- 

43

Rate Cal 

43

Ratio Rate 

41

Ratio Rate 

53

Raven GPS + Lightbar Setup 

129

Raven GPS Setup 

128

Rbin Folder 

256

Rbin Options 

276

Rbin Viewer 

263

Re-Addressing Product Nodes 

28

Recal A-B Button 

250

Registering Your Viper System 

16

Report Notes Information 

174

Reset A-B Button 

249

Reset History 

285

Resetting Defaults 

224

Resetting PowerGlide Plus Defaults 

226

Resetting the Tally Registers 

59

Resetting UltraGlide Defaults 

224

Restarting a Paused Job 

162

Reverse Polarity 

134

Rx Look-Ahead 

112

Rx Map Colors 

113

Rx Map Issues 

292

Rx Tab 

83

Rx+Cov+Scout Tab 

82

RxMaps Folder 

257

RxMaps\colors Sub-Folder 

257

Saving an AB Line 

252

Saving Profile Information 

121

Scout Folder 

257

Scout Maps 

104

Scout Tab 

87

Screen Calibration 

14

Screen Tool Icons 

93

Seed 244
Select the Coverage Display Options 

274

Selecting a New Controller 

27

Selecting a Program 

14

S

R

Serial Communication Port Setup 

125

Set A/Set B Button 

250

Set Flag\Goto Flag\Clear Flag Button 

251

Setting Folder 

257

Setting or Resetting Distance and Individua

59

Setting the Correct Operating Time Zone 

124

Setting the Coverage Map Percentages and

108

Setting the Unit of Measurement 

123

Setting up Booms 

141

Setting up the Auxiliary Port for External S

259

Setting Up the Controller Area Network (C

23

Setting up the GPS Comm Port to a Non-R

127

Setup Button 

97

Setup Error Messages 

293

Setup Issues 

290

Single Product VRA 

100

Speed 36
Speed 67
Speed Cal 

32

Speed Sensor 

32

Spiral 242
Spreader 43
Standard AccuBoom Method 

194

Starting a Job with External Rate Control 

260

Starting a New  Job 

155

Straight AB 

233

Street Maps 

102

Streetmaps Folder 

257

Swath Number 

249

Swathing Pattern 

249

Swathing Patterns 

232

System Status Icons 

94

Tabs 71
Tabs 78
Tally Registers 

58

Tank Volume 

43

Temp 134
The Viper Interface 

2

Tilt 134
Tilt Filter 

134

Tilt Sensor 

130

T

Summary of Contents for 2.08

Page 1: ...Installation Operation Manual VIPER 2 08...

Page 2: ......

Page 3: ...RGL 600 Universal Smartrax Package 13 Programs Menu 13 Selecting a Program 14 Screen Calibration 14 Registering Your Viper System 16 Viper Care and Use 21 Chapter 2 Setting Up the Controller Area Net...

Page 4: ...Delay 53 PWM 53 Pressure Area 54 Dual Pressure 54 Calibrating the Pressure Transducer Using an Analog Gauge 55 Entering a Setting with no Analog Gauge 55 ApplicationArea 56 Tally Registers 58 Resettin...

Page 5: ...o the Viper Console 103 Deleting Street Maps 104 Scout Maps 104 External Waypoint Switchbox 106 About Offsets 107 Coverage Maps 108 Setting the Coverage Map Percentages and Colors 108 Zero Rate Tolera...

Page 6: ...figuring Viper for Lightbar Guidance 137 Configuring the On Screen Lightbar 137 External Lightbar 139 Boom Settings and Mapping 140 Boom Setup 140 Setting up Booms 141 BoomMapping 145 Mapping the Boom...

Page 7: ...oom Override 191 Enabling AccuBoom Override 191 AccuBoom Spray No Spray Zones 193 Standard AccuBoom Method 194 Create AccuBoom No Spray Map Method 194 Load AccuBoom No Spray Map Method 195 Create Map...

Page 8: ...Step 243 Seed 244 Headlands with Contour 245 Headlands 2 with Contour 246 Using the Guide Tab 248 Lightbar Display 249 Off Swath Distance 249 Swath Number 249 Swathing Pattern 249 LB Bright Button 24...

Page 9: ...Viewer 266 Viewing Rbin Files 270 To Open an Rbin Report 270 Exporting Shapefiles 272 Toolbar Options 273 To Select the Coverage Display Options 274 To Change Coverage Map Colors 275 Rbin Options 276...

Page 10: ...lating and Verification of Spreader Constant 305 Appendix D Calculating Speed Calibration 307 Appendix E Calculating Calibrations for Liquid and Granular Applications 309 Appendix F Testing the Speed...

Page 11: ...Button 235 Contour 2 Button 236 Contour Fixed 233 B C A About Button 96 About Offsets 107 AccuBoom Tab 92 Accessing Coverage Map Information 86 Accessing the Local Setting Menu 119 Accessing the Rx Ma...

Page 12: ...e 191 Enabling Autoboom 219 Enabling Manual Console Display 280 Enabling Product Chaining 177 Enabling Zero Rate Zone Shut Off 191 Entering a Setting with no Analog Gauge 55 Entering the Activation Ke...

Page 13: ...Maintaining the Flashdisk 258 Map Area 68 Mapping the Booms 146 J K L M I Maps 101 Marking a Field Boundary 87 Menus 95 Meter Cal Density 43 Min PW 49 Miscellaneous 31 Miscellaneous Messages 184 Multi...

Page 14: ...y Options 274 Selecting a New Controller 27 Selecting a Program 14 S R Serial Communication Port Setup 125 Set A Set B Button 250 Set Flag Goto Flag Clear Flag Button 251 Setting Folder 257 Setting or...

Page 15: ...n Alarm 40 Valve Cal 48 Valve Cal 2 48 Valve Delay 53 Variable Rate Control VRC Error Messa 296 Vehicle Information 171 Viewing an Existing Job 163 Viewing Rbin Files 270 Viper CAM AccuBoom Installati...

Page 16: ...Viper Installation and Operators Manual 2 08...

Page 17: ...o his distributor or to Raven for final approval WHAT WILL RAVEN INDUSTRIES DO When our inspection proves the warranty claim we will at our option repair or replace the defective part and pay for retu...

Page 18: ...m Sioux Falls SD 57117 5107 fcdinfo ravenind com Viper 2 08 Installation Operator s Manual P N 016 0159 894 Rev H 01 07 Notice This document and the information provided are the property of Raven Indu...

Reviews: