Connecting 7700 FSP Cluster Storage Devices
530-0267-00 Rev 02
7700 Flash Storage Platform Installation Guide 7.6.3.x
35
3.
Repeat the port connections using available ports on the two FC switches if you are installing
more than one shelf.
4.
Connect the FC switches to the 7700 FSP Controllers using the slot number-port number
cabling shown in Figure 2.5 and Figure 2.9.
Note:
For instructions on setting up the zoning configuration for the southbound Fibre Channel
switches, see
Chapter 4, Southbound Fibre Channel Switch Zone Configuration
.
Table 2.5 lists the ports connecting the 7700 FSP Controllers, FC switches, and all supported
shelves. The labels for the cables use the Table 2.4 label naming convention (with each label listing
the end-to-end port connections).
Note:
The "==" shown in the end-to-end cable labels represents the cable connecting each of the
respective cable ends with a port (for example, in SW:A-0==CT:A-5-0, the cable connects port 0 on
Fibre Channel switch A and port 5-0 on 7700 FSP Controller A).
FC Switch (A/B)
and Ports
7700 FSP Controller/
Shelf Ports
Fibre Optic Cable
Labels
FC Switch A and B Ports
7700 FSP Controller A
End-to-End Label
SW:A-0
CT:A-5-0
SW:A-0==CT:A-5-0
SW:A-1
CT:A-4-0
SW:A-1==CT:A-4-0
SW:B-0
CT:A-5-1
SW:B-0==CT:A-5-1
SW:B-1
CT:A-4-1
SW:B-1==CT:A-4-1
FC Switch A and B
7700 FSP Controller B
End-to-End Label
SW:A-2
CT:B-5-0
SW:A-2==CT:B-5-0
SW:A-3
CT:B-4-0
SW:A-3==CT:B-4-0
SW:B-2
CT:B-5-1
SW:B-2==CT:B-5-1
SW:B-3
CT:B-4-1
SW:B-3==CT:B-4-1
FC Switch A
Shelf 1 (MG-A and MG-B)
End-to-End Label
SW:A-4
SH:1-A-100
SW:A-4==SH:1-A-100
SW:A-5
SH:1-A-102
SW:A-5==SH:1-A-102
SW:A-6
SH:1-B-100
SW:B-6==SH:1-B-100
SW:A-7
SH:1-B-102
SW:B-7==SH:1-B-102
FC Switch B
Shelf 1 (MG-A and MG-B)
End-to-End Label
SW:B-4
SH:1-A-101
SW:B-4==SH:1-A-101
SW:B-5
SH:1-A-103
SW:B-5==SH:1-A-103
SW:B-6
SH:1-B-101
SW:B-6==SH:1-B-101
SW:B-7
SH:1-B-103
SW:B-7==SH:1-B-103
Table 2.5 Cable Bundle End-to-End Port Connections