
Step 3b:
Prep for Extension Unit
When installing Extension units, do not thread the nut
until attached the shelf from the Extension kit. See the
“Make it Wide” instructions on next page for more
information.
Step 4:
Finish
Stand the unit upright and add your favorite 16 bottles into each bin.
For maximum stability, we recommend attaching all Bin configurations to the wall using the included Wall
Anchor Bracket. With unit pressed against the wall, find the pre-drilled hole on the back post of the Bin
unit and mark its location on the wall. Pre-drill a hole (1/2” for provided drywall anchor). Then, attach
the unit to the wall using the provided toggle bolt. Repeat for all Bin units.
Instructions