![Vintage Air 11300-VUZ-A Manual Download Page 6](http://html1.mh-extra.com/html/vintage-air/11300-vuz-a/11300-vuz-a_manual_1028471006.webp)
6
901300-VUZ REV I 10/29/14, SLIMLINE HCD PG 6 OF 13
INSTALLATION
FRONT
BRACKET
FRONT
BRACKET
REAR
BRACKETS
DASH LIP
DASH LIP
DRAIN HOSE
#8 x 1/2"
SHEET METAL
SCREWS
DRILL
9/32"
HOLE
IN DASH LIP
DRILL
9/32"
HOLE
IN DASH LIP
1/4" x 1/2" BOLT
1/4" x 1/2" BOLT
1/4" x 1/2" BOLT
1/4" x 1/2"
BOLT
1/4" x 1"
BOLT
1/4" x 1"
BOLT
1/4" NUT
1/4" NUT
1/4"
FLAT WASHER
1/4"
FLAT WASHER
FIGURE 2
FIGURE 3
OFF LO
MED
HI
ENCO
A/C
DEF
C
OFF
ECONO
C
A/C
MED
HEAT
DEF
ATTACH EVAPORATOR BRACKETS TO EVAPORATOR (SEE FIGURE 2).
POSITION EVAPORATOR WITH BRACKETS UNDER DASH. MARK AND DRILL TWO (2) 9/32"
DIAMETER HOLES UNDER THE LIP OF THE DASH.
ATTACH THE FRONT BRACKETS TO THE DASH WITH 1/4" x 1" BOLTS, WASHERS AND NUTS PROVIDED
(SEE FIGURE 2).
ATTACH REAR EVAPORATOR BRACKETS (USING TWO #8 x 1/2" SHEET METAL SCREWS) TO THE COWL
OR FIREWALL.
ATTACH THE DRAIN HOSE (SEE FIGURE 3) AND DRILL A 9/16" DIAMETER HOLE IN FIREWALL 1" BELOW
THE BOTTOM OF THE EVAPORATOR.
Summary of Contents for 11300-VUZ-A
Page 13: ......