- 15 -
Install
er’s Instructions
WARNING
•
Always check wiring harness connections before initiating any test
procedures.
•
Disconnect electric power from the appliance before performing any
maintenance or repairs.
•
Voltage checks should be made by inserting meter proves beside the
wires in the connector blocks with the electric power source on and the
connector block plugged in.
•
Resistance checks should be made on components with the electric
power off and the connector block disconnected.
Federal law requires that WINE-MATE split cooling systems be
installed by an EPA certified refrigeration technician.
1. General Instructions
WINE-MATE split system is shipped as components and is ready for use only after
a certified refrigeration technician has properly installed the system. Proper
installation is critical. Vinotemp can only warrant the quality of the components.
The installation and proper operation of the system must be warranted by the
installer. Installation of the system must be done in accordance with all state and
local building and electrical codes.
The condensing unit and evaporator unit are connected by a liquid line and an
insulated suction line that are supplied by the installer. These lines must be
properly sized for the distance between the two units. After the units and lines are
connected, the system must be checked for restriction, pressurization and leak.
Then the system must be evacuate and charged with refrigerant. Refrigerant
amount will vary depending on the length of line set.
Parts included:
Evaporator Unit (liquid line solenoid valve and expansion valve installed)
Condensing Unit (discharge and suction valves installed)
Liquid Filter
Liquid Indicator
Temperature Controller (4.5”LX4.5”WX3.75”D) + Air Probe
Parts not included:
Liquid line copper tubing