Figure 2 Position of Base Flanges
Begin by determining exact location of the four
(4) corners of the building. Mark front edge and
side-to-side width of assembly on ground. Drive
alignment stakes into the ground outside of the
markings, and draw alignment strings along both
ends and sides of the building to the dimensions
shown in Figure 2. The outline of the strings will
represent the final location of the base flanges.
The initial location of each Corner Base
Flanges(part #6L
&6R
) is critical to the alignment
and fit of the frame components and cover.
Step #1 --SECURING BASE FLANGES
Sit the building boxes in the chosen location. Remove all the components from packaging
to ensure all components are present by checking with the Part List.
6L
6R
2.0m
2.0m
2.0m
2.0m
2.0m
2
.29m
7R
8
3
.7m
Diagonals are equal
12.0m
2.0m
F
RONT
7m
7L
9
1
.65m
1
.65m
Locate the Left Corner Base Flange and
Right Corner Base Flange(part #6L&6R).
Secure the base flanges with Stake Pegs
(Part #23). Measurements shown in Figure 2
are to the center of the upright sockets on
each Base Flange.
The Shelter must be secured to a firm surface
that can receive and retain augers and pegs
firmly in position. The shelter should be
installed on FIRM GROUND, not on
SWAMP, SOFT/WET GROUND. The Base
Flanges must be secured so they cannot be
moved. Arches are tensioned at their base as
they insert into the Base Plate sockets.
2
.3
55m
2
.3
55m
23
Figure 3
As Figure 3 shows, each base
flange is equipped with three
stake pegs.