Vikre Handel AS JIT-2040 Installation Manual Download Page 11

Figure 10: Fastening the Roof Cover

Step #6 --TENSION COVER ON

FRAME FROM SIDE-TO-SIDE

As Figure 10 shows, when Roof Cover is over top

of Frame Assembly, insert Cover Tensioning
Tubes into pockets along both sides of Roof
Cover. Center Roof Cover over Frame assembly

both side to side and front to back. Align one side

of Roof Cover evenly front to back. Add Band for
Tie Down Ratchet at each point along the cover
opening, as shown. Put Band for Tie Down
Ratchets over Cover Tensioning Tubes at each
Base Plate along one side. Bands do not attach to
Tensioning Tubes, but loop around and secure at

both ends on ratchet.

Next take up slack in tie bands by ratcheting the
mechanisms, tightening cover. Evenly adjust
ratchets on both sides of roof cover to take
wrinkles out of roof cover. 

DO NOT 

fully tighten

cover yet. Leave adequate slack so that cover can
also be adjusted front to back in next step.

Step #7 --TIGHTEN ROOF COVER
ON FRAME FRONT TO BACK

The roof cover is tensioned from front to back by
the rope lacing to grommet flaps inside the main
cover, inside the unit at both front and rear arches.
Using the rope provided, lace the main cover
grommet flap around the main frame front and rear
arch pieces. Start in the top middle of each arch, and
lace to each side. Add rope length by tying pieces
together or cutting as necessary.

Lace all grommets on cover inside flap with rope.

Starting at the middle top point over the door,

tighten lacing only enough to take wrinkles out of
the cover. Repeat for the Rear Arch. 

DO NOT 

over

tighten lacing to pull out the grommets.

After the roof cover lacing is adjusted evenly across
the grommet flap, go back and re-adjust the
Tensioning Ratchets along the side edges of the
Roof Cover. At this point, the main cover can be
pulled taut enough to take all excess material and
wrinkles out of cover. It will be necessary to repeat
this step 2-3 weeks after unit assembly is complete
and roof over has a chance to stretch out over the
frame completely.

First circle the band for tie
down ratchet (part#26)
around the tensioning tube
through the cuts on the
pocket of the roof cover.

Before inserting the cover tensioning
tube(part #17) into pocket of roof cover,
you need to make cuts for band of
Ratchet on the cover  first. Firstly please
draw the outline of the cuts according to
the position of Ratchet. The position of
cuts should be right upon the ratchets.

draw the outline of cuts

Then make the cuts using
forfex along the outlines.

Then put the bands
through the reel of the
ratchet, and tension
the band by ratchet.

Summary of Contents for JIT-2040

Page 1: ...CARPORT SHELTER MODEL JIT 2040 L12 0xW6 2xH4 0M www vikre no Installation Manual...

Page 2: ...now drifts in slippery places or in wet location The cover of the building will protect against normal falling leaves and light debris however large fast or sharp falling items etc may cause a punctur...

Page 3: ...to replace the cover Begin with making certain all the bolts of the frame and the tensioning equipments be well fixed When taking off the cover make sure the related ropes etc be taken off and the co...

Page 4: ...tanding tube of roll up door 2 10 Lower standing tube of roll up door 2 Part List of Model JIT 2040 10 Lower standing tube of roll up door 2 11 Beam beside roll up door frame 2 12 Beam of the roll up...

Page 5: ...er door frame and track 2 29 Lower left door frame and track 1 29A Lower right door frame and track 1 30 Beam beside mechanical door frame 2 31 Beam for the winch of the door 1 32 Beam of the mechanic...

Page 6: ...L1 L L2 R1 R R2 2 3 3A 3C 3B 4 5R 5L 6R 6L 7 7A 9 10 11 12 14 18 28 29A 29 30 31 32 Figure 1 Sketch of JIT 2040 Size L12 W6 2 H4M...

Page 7: ...in by determining exact location of the four 4 corners of the building Mark front edge and side to side width of assembly on ground Drive alignment stakes into the ground outside of the markings and d...

Page 8: ...f Two roof tubes Part L L1 L2 R R1 R2 Two shoulder tubes Part 2 Two sidewall tubes Part 3 3A 3B 3C Assemble the front and back panel frame According to Figure 5 6 connect the end wall frame by Using t...

Page 9: ...on into Base flanges Immediately after putting first interior arch into place connect Front Arch and Interior arch using Roof Purlin Tubes at top ridge and side shoulder cures of arches Secure the Roo...

Page 10: ...ady to install Roof Cover unpack cover and lay parallel to building frame on one side Cover must be pulled over top of frame assembly without being snagged or stressed on any frame members Use multipl...

Page 11: ...e front and rear arch pieces Start in the top middle of each arch and lace to each side Add rope length by tying pieces together or cutting as necessary Lace all grommets on cover inside flap with rop...

Page 12: ...Figure 11 Fastening the two ends of the Roof Cover Figure 12 Installation of the Front Cover Figure 13 Installation of the Back Cover...

Page 13: ...ropping Tube 33A When the steel cable goes down though the hole in the Bottom Door Dropping Tube 33A tie a knot in the steel cable Door can now be opened or closed by operating the Winch Assembly Rais...

Reviews: